Powell Constructors, Inc., an Equal Opportunity Employer, is seeking quotes from all qualified subcontractors and suppliers including certified DBE firms performing a commercially useful function for the referenced project:
Agency: Caltrans
Project No. 07-353204
Project: Cold plane AC pavement, place HMA and concrete pavement.
Location: Rte.405 in Los Angeles-Various locations from OC line to Rte. 405/110 Separation.
Estimate: $96,000,000
DBE:21%
Bid Due Date: February 27, 2025, at 2:00 PM
Bid Due Date: March 13, 2025, at 2:00 PM
Addendum 1 issued 2/12/2025
https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=07-353204
ALL BID ITEMS ARE OPEN FOR BID, including items of work normally performed by Powell Constructors, Inc.
Lead Compliance, Dispute Resolution Board, Construction Area Signs, Traffic Control System, Temporary Crash Cushion, Swppp Planning, Swppp Materials , Street Sweeping, Temporary Concrete Washout, Asbestos Compliance Plan, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Work Area Monitoring (Bridge), Treated Wood Waste, Sampling And Analysis Plan (Naturally Occurring Asbestos), Clearing And Grubbing, Roadway Excavation, Roadway Excavation (Aerially Deposited Lead), (F) - Structure Excavation (Soldier Pile Wall),(F) - Structure Backfill (Soldier Pile Wall), (F) - Concrete Backfill (Soldier Pile Wall), (F) - Lean Concrete Backfill, Ditch Excavation, Roadside Clearing, Prune Existing Plants, Rock Blanket, Landscape Materials, Plant Establishment Work, Wood Mulch, Irrigation Maintenance, Remove Irrigation Facility, Irrigation Materials, Aggregate Base, Lean Concrete Base Rapid Setting, Base Bond Breaker, Crack Treatment, Tack Coat, Replace Asphalt Concrete Surfacing, Hot Mix Asphalt , Place HMA Dike, Remove Asphalt Concrete Pavement, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete Pavement (RSC), Individual Slab Replacement (RSC), Remove Concrete Pavement And Base, Grind Existing Concrete Pavement, Ground Anchor (Subhorizontal), Temporary Support, Steel Soldier Pile , Drilled Hole, Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), (F) - Structural Concrete, Wall Facing, (F) - Minor Concrete (Minor Structure), Concrete Surface Texture (Fractured Rib), (F) - Bar Reinforcing Steel (Wall Facing), (F) - Structural Steel (Bridge), (F) - Furnish Sign Structure, (F) - Install Sign Structure, Remove Sign Structure Walkway , Remove Sign Structure, (F) - Timber Lagging, Clean And Paint Structural Steel, Clean And Paint Steel Soldier Piling, Spot Blast Clean And Paint Undercoat, Bridge Removal (Portion), Heat Straighten Steel Girder, RCP, Corrugated Steel Pipe, Precast Concrete Pipe Manhole, Remove Pipe, Cleaning, Inspecting, And Preparing Culvert, Cured-In-Place Pipeliner, Minor Concrete (Gutter), Detectable Warning Surface, Minor Concrete, Remove Curb, Remove Concrete (Curb And Gutter), Remove Concrete (Curb, Gutter, And Sidewalk), Pre/Post Construction Surveys, (F) - Miscellaneous Iron And Steel, Modifying Signal And Lighting Systems, Prepare And Stain Concrete, Chain Link Fence, Remove Chain Link Fence, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker, Treatment Best Management Practice Marker, Remove Roadside Sign (Wood Post), Remove Roadside Sign Panel, Furnish Sign Panels, Metal, Roadside Sign, Install Sign, Roadside Sign Installed On Structure, Install Sign Panel On Existing Frame, Install Roadside Sign (Laminated Wood Box Post), Furnish Laminated Wood Box Post, Install Roadside Sign On Sound Wall, Midwest Guardrail System, Vegetation Control (Minor Concrete), Double Midwest Guardrail System (Wood Post), Alternative Crash Cushion, Alternative In-Line Terminal, Concrete Barrier, Mfleat Flared Terminal, Concrete Barrier, (F) - Concrete Barrier Transition, Remove Guardrail, Remove Concrete Barrier, Remove Crash Cushion, Thermoplastic Pavement Marking & Striping, Paint Pavement Marking & Striping, Remove Thermoplastic Traffic Stripe & Markings, Rumble Strip (Asphalt Concrete Pavement), Maintaining Existing Traffic Management System Elements During Construction, Electrical, Water Meter Charges, & Trucking.
Quotations will be broken down into comparable packages as reasonably necessary. Powell Constructors, Inc. will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.Requirements: Union Signatory, 100% Payment and Performance Bonds from an accepted surety may be required. Powell Constructors, Inc. will reimburse the subcontractor for bond premium up to 2%. Assistance in bonding, insurance, lines of credit or obtaining equipment, supplies, materials, or related assistance or services is available upon request. Subcontractors must possess a current contractor's license and provide General Liability, Auto and Worker's Compensation Insurance meeting the minimum requirements per the specifications. Subcontractors must also be registered with the Department of Industrial Relations (DIR) pursuant to the Labor Code section 1725.5. Powell Constructors, Inc. is an Equal Opportunity Employer and greatly encourages DBE participation.
Plans and Specifications are available for review at the following locations:
CALTRANS Website:
https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project-calendar.php?q=07-353204
Powell Constructors, Inc.
8555 Banana Ave.
Fontana, CA 92335
Phone (909) 356-8880
Fax (909) 356-1299
For More information or questions, please contact our estimator
Estimator: Joe Schulte
Email Quotes: Estimate@powellconstructors.com |