www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date February 26, 2025 @ 12:05 p.m. through bid opening date

Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: County of Fresno
Project: Jacalitos Creek Bridge Replacement on Lost Hills Road
Located in Fresno County, CA
Bids open 2:00 PM local time on Thursday, March 27, 2025
Please submit all bids by 1:00 PM on 3/27/2025
Engineers Estimate $7,200,000 - $8,000,000
DBE Goal: 17%

General work description: The work to be done consists, in general, of widening the existing roadway (no additional capacity) and replacing the structurally deficient two-lane bridge with a standard two-lane bridge. The Jacalitos Creek Bridge on Lost Hills Road (Bridge No. 42C0078 / 03-038) is located 3.8 miles south of the community of Coalinga. The new bridge structures will consist of pre-cast, pre-stressed concrete voided slabs which will be supported by outrigger piers, pier caps, and a Cast-In-Drill-Hole concrete pile foundation. The work also includes constructing abutments, installing bridge concrete barriers, finishing the bridge decks with polyester concrete overlay, and placing a hot mix asphalt concrete overlay on the roadway approaches. A temporary detour road will be created with temporary railings and temporary crash cushions.

Estimating Dept.
Email: estimating@papichconstruction.com

The Project plans can be accessed via this link 24-08-C Jacalitos Creek Bridge Replacement on Lost Hills Road - County of Fresno

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Construction Project Funding Sign, Traffic Control System, Temporary Traffic Stripe (Paint), Temporary Railing (Type K), Temporary Crash Cushion Module, Job Site Management, SWPPP, Permanent Erosion Control, Bird Exclusion Plan, Install And Maintain Bird Exclusion Devices, Temporary Creek Diversion Systems, Temporary High-Visibility Fence, Clearing And Grubbing, Roadway Excavation, Structure Excavation (Type D), Structure Backfill (Bridge), Hydromulch, Fiber Rolls, Hydroseed, Finishing Roadway, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Cold Plane Asphalt Concrete Pavement, 30" Cast-In-Drilled-Hole Concrete Piling, 36" Cast-In-Drilled-Hole Concrete Piling, Prestressing Cast-In-Place Concrete, Structural Concrete, Bridge Footing, Structural Concrete, Bridge, Structural Concrete, Bridge (Polymer Fiber), Joint Seal (Mr 2"), Bar Reinforcing Steel, Bridge Removal, 18" Corrugated Steel Pipe, Rock Slope Protection, Rock Slope Protection Fabric, Minor Concrete (Gutter), Miscellaneous Metal (Bridge), Fence (Type Bw, Metal Post), Remove Fence, Reconstruct Fence (Type Bw), Pavement Marker (Retroreflective), Object Marker (Type P), Remove Marker, Remove Roadside Sign, Remove Metal Post, Roadside Sign - One Post, Short Radius Guardrail System, Vegetation Control (Minor Concrete), Tubular Bicycle Railing, Transition Railing (Type Agt), Alternative In-Line Terminal System, Concrete Barrier (Type 85), Remove Wood Guardrail, 6" Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Remove Painted Traffic Stripe. See Plans and Specs for complete list.

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME