
Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: County of Monterey
Project: Viejo Road Emergency Storm Damage, Project 621095C
Plans & Specs: https://www.countyofmonterey.gov/government/departments-i-z/public-works-facilities-parks/public-works/projects-out-to-bid
DBE Goal: 14%
Bid Date: March 28, 2025, at 2:00 PM
Quotes Due by 12:00 PM 03/28/25
Engineers Estimate: $1,081,000.
General work description: The project is to repair a section of Viejo Road damaged during a major storm event. The project is located near the City of Monterey. In general, the project consists of roadway excavation, drainage and culvert work, placement of rock slope protection, clearing and grubbing, hot-asphalt-mix paving and traffic control.
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Construction Staking, Construction Area Signs, Type Iii Barricade, Job Site Management, Prepare Water Pollution Control Program, Temporary Fiber Roll, Temporary Silt Fence, Temporary Construction Entrance, Contractor-Supplied Biologist (Ls), Temporary High- Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Imported Borrow (Cy), Fiber Rolls, Hydroseed, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type E), 36" Corrugated Steel, Pipe (.079" Thick), 4" Perforated Plastic Pipe Underdrain, 4" Plastic Pipe Underdrain, Class 1 Permeable Material (Blanket), 36" Corrugated Steel, Pipe Downdrain (.079" Thick), Flume Downdrain, Tapered Inlet, 36" Anchor Assembly, Flume Anchor Assembly, Concrete Anchor And Cable Assembly, 36" Steel Flared End Section, Remove Culvert (Lf), Rock Slope Protection (150 Lb, Class Iii, Method B), Rock Slope Protection Fabric (Class 8)
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |