Angotti & Reilly, Inc. request all DBE, DVBE, LBE, MBE, SBE, WBE subcontractor firms to submit BID proposals for the following University of California, San Francisco project, per the specification, drawings and addendum.
DISTRICT: University of California, San Francisco
PROJECT: UCSF PRJ-000365 MB CVRB Fallen Walkway Repair
DATE/TIME: March 26, 2025, at 2:00 p.m. LOCAL TIME
ESTIMATED CONSTRUCTION COST: $250,000 - $300,000
DESCRIPTION OF WORK: Replacement of the existing failed hinge slab, differentially settled soil condition, walkway tile, and storm drain piping at the northern building entry of 555 Mission Bay Blvd South. Construction of a 895 gross square foot, concrete hinge slab at northern exterior entryway, with associated demolition, earthwork, utilities, and tile walkway. Trade work is expected to include, but is not limited to, demolition, formwork, concrete, rebar, tile, waterproofing and plumbing.
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: DEMO | CONCRETE, CAST-IN-PLACE, FORMWORK | REBAR | EARTHWORK | TILE | WATERPROOFING | PLUMBING | UTILITIES
In order to allow ample time to review your proposal, please ensure your BID proposal is received prior to 11AM on March 26, 2025. Send BID proposal and any questions to the estimating dept at estimating@angotti-reilly.com
For complete project bidding information:
UCSF PRJ-000365 MB CVRB FALLEN WALKWAY REPAIR Project. If you are unable to review the Specifications, Drawings or Addendum, please contact us at estimating@angotti-reilly.com
ANGOTTI & REILLY, INC.
2200 Jerrold Ave, Suite E
SF CA, 94124
415.575.3700 OFFICE
415.575.1470 FAX
An Equal Opportunity Employer |