www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date March 26, 2025 @ 3:05 p.m. through bid opening date

Miller Equipment Company, Inc. Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency:Mojave Air & Space Port
Project:Mojave Air & Space Port at Rutan Field Taxiway A Reconstruction, Phase 1
Location:Mojave Kern CA 93501
Goals for minority participation for each trade: 19.1%
Goals for female participation in each trade: 6.9%

Bids open April 18, 2025, at 11:00 AM

DESCRIPTION OF WORK:
• Milling of existing asphalt concrete pavement
• Application of crack fill material
• Overlaying new asphalt concrete pavement
• Removal of existing asphalt concrete pavement section (Asphalt, base course and partial subgrade)
• Subgrade stabilization
• Placement of new base course
• Construction of new asphalt concrete pavement
• Application of new pavement markings

Plans & Specs are available to view at our office or Interested parties may download the digital documents for twenty-two dollars ($22.00) by inputting Quest Project #9590739
https://www.mojaveairport.com/media/2391

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Airfield Safety And Traffic Control, Pavement Removal, Unclassified Excavation, Cement Treated Subgrade At 6” Thickness, Crushed Aggregate Base Course – 13” Thickness, Asphalt Surface Course, Asphalt Base Course, Pavement Markings, Pavement Marking Removal, Asphalt Crack Repair, Cold Milling, 2-Inch Depth. See plans and specs for a complete list of bid items.

Requirements: Miller is signatory to Operating Engineers, Laborers. 100% performance and payment bonds required for the full amount of the subcontract price. Miller may assist with the bond premium up to 1.5%. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Miller’s requirements and will be required to sign the standard Miller Subcontract Agreement. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Subcontractors must also be registered with a current DIR number. Quotations will be broken down into comparable packages as reasonably necessary. Miller will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Miller intends to work cooperatively with all qualified firms seeking work on this project. Miller is an Equal Opportunity Employer.

Miller Equipment Company, Inc
PO Box 2956 Lancaster, Ca 93539
Phone: 661-945-2525 Fax: 661-945-1183

Estimator: Steven Devers
Email: Steve@millereqco.com

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME