
An Equal Opportunity Employer
Specialty Construction, Inc. Requests Sub-bids from All Qualified & Certified Section 3 Businesses, SBE/WBE Subcontractors/Suppliers for:
Agency: Lost Hills Utility District
Project: WTP – Booster Pump Improvement
Section 3 Businesses, SBE/WBE participation
Bid Date: April 15, 2025, at 2:00 PM
Plans and Specs are available at the following link: 25-017 WTP Booster Pumps, Lost Hills Utility District
General work description: The work to be performed consists, in general, the removal of two existing booster pumps and Variable Frequency Drives and installing two large booster pumps and Variable Frequency Drives along with upsizing the upstream and downstream metal piping to accommodate the large pumps and associated electrical and instrumentation for the pumps. A bid Alternate for the addition of a reclaim pumping system (package sump pump) and associated piping for capturing reclaim water from the existing sludge press, along with the associated electrical for a complete system. All other items or details required by the plans, Standard Specifications, and these specifications are to be performed, constructed or furnished and installed.
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Piping System Upgrades, Pump Upgrades, Electrical VFDS, Miscellaneous Electrical , Environmental Pre-Con Survey, Reclaim Package Pump Station- Purchase And Install, Piping – Drain And Discharge To Top Of Tank
Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested Section 3 Businesses,WBE/SBE firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price. SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate. For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents
Specialty Construction, Inc.
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722
Contacts:
John Holt : jholt@specialtyconstruction.com
Sheri Shamblin: Shamblin@specialtyconstruction.com |