www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date June 17, 2024 @ 12:20 p.m. through bid opening date

License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Riverside Construction Company, Inc. an Equal Opportunity Employer is requesting sub-bids from all qualified subcontractors and suppliers including certified DVBE/SBE firms performing a commercially useful function for referenced project:

Agency: Caltrans No. 08-1J4704, Route 10
Project: Construction on State Highway In Riverside County Near Chiriaco Summit At Three Star Ditch Bridge And At Determination Ditch Bridge
Bids open July 17, 2024 at 2:00 PM
Engineers Estimate: $7,200,000

General work description: Partially grouted RSP, structure excavation and roadway excavation in Riverside County

DVBE Strongly Encouraged, 5% SBE Goal

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Develop Water Supply, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier System, Portable Changeable Message Sign (Ea), Alternative Temporary Crash Cushion Tl-3, Temporary Traffic Screen, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Storm Water Annual Report, Temporary Soil Binder, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Construction Entrance, Temporary Concrete Washout, Temporary Creek Diversion Systems, Treated Wood Waste, Contractor-Supplied Biologist (Ls), Natural Resource Protection Plan, Clearing And Grubbing (Ls), Roadway Excavation, (F) - Structure Excavation (Bridge), Structure Excavation (Rock Slope Protection), (F) - Structure Backfill (Bridge), Embankment, Roadside Clearing, Move-In/Move-Out (Erosion Control), Duff (Sqft), Bonded Fiber Matrix (Sqft), Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Rubberized Hot Mix Asphalt (Gap Graded), Tack Coat, Cold Plane Asphalt Concrete Pavement, (F) - Structural Concrete, Bridge (Polymer Fiber), Drill And Bond Dowel, (F) - Bar Reinforcing Steel (Bridge), Bridge Removal (Portion), Location A, Bridge Removal (Portion), Location B, Partially Grouted Rock Slope Protection (300Lb, Class Iv, Method B) (Cy), Rock Slope Protection Fabric (Class 10), Fence (Type Bw, Metal Post), Remove Fence (Type Bw), Temporary Desert Tortoise Fence, Desert Tortoise Fence, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Object Marker (Type P), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Transition Railing (Type Agt), Alternative In-Line Terminal Tl-3, (F) - Concrete Barrier (Type 842 Modified), Remove Guardrail, 6" Two-Component Paint Traffic Stripe, Paint Traffic Stripe (1-Coat), Remove Thermoplastic Traffic Stripe, 12" Rumble Strip (Asphalt Concrete Pavement), 6" Traffic Stripe Tape With Contrast (Warranty), Mobilization

Lead Estimator: Bryan Lounsbury
Email: estimating@rivconstruct.com

Bid documents are available on Riverside Construction's plan room website atbids.rivconstruct.com

Riverside Construction Company, Inc is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker’s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum Participation.

Riverside Construction Company, Inc.
License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run from date posted through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME