www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date September 16, 2024 @ 3:34 p.m. through bid opening date

License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Riverside Construction Company, Inc. an Equal Opportunity Employer Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers performing commercially useful functions for the following project:

Agency: San Bernardino County Flood Control District

DESERT KNOLLS WASH PHASE III FLOOD CONTROL IMPROVEMENT PROJECT
From Existing Trapezoidal Concrete Channel to just North of the Confluence with the Mojave River    
Federal-aid Project Federal No. CFDA Number 66.202 

DBE Goal: 13% 

Bids open October 31st, 2024 @ 11:00 AM

***Addendum 1 issued 09/26/2024***
***Addendum 2 issued 10/09/2024***

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Mobilization, Locate And Protect Existing Utilities, Quality Control Program, Project Schedule (Critical Path), Trench And Excavation Safety/Temporary Shoring, Develop Water And Power Supply, Portable Changeable Message Sign, Traffic Control System, Prepare Final Storm Water Pollution Prevention Plan., Stormwater Pollution Prevention Plan Implementation, Construction Protection, Diversion And Control Of Water/Dewatering, Environmental Mitigation, Remove And Reuse Existing Rocks (F), Break, Remove, And Reuse Existing Concreted Rock Slope Protection (Crsp) (F), Remove Double Drive Chain Link Gate, Remove Chain Link Fence, Remove Abandoned Gravity Sewer Pipe, Remove Abandoned Sewer Manhole, Remove Concrete Slab, Construction Field Office Facility, Clearing And Grubbing, Excavation (F), Structure Backfill, Embankment (90% Relative Compaction) (F), Structural Concrete, Multiple Box Culvert, Structural Concrete, Headwall, Wingwall, Parapet, And Cut-Off Walls, Structural Concrete, Apron And Cut-Off Wall, Remove Corrugated Steel Pipe, Rock Slope Protection (1 Ton, Method A) - Riprap Splash Pad (F), Concreted-Rock Slope Protection (1/4 Ton, Method A) (F), Concreted-Rock Slope Protection (1/4 Ton, Method A) - Cut Off Wall (F), Concreted-Rock Slope Protection (1/4 Ton, Method A) - Grade Control Structure (F), Concreted-Rock Slope Protection (1/4 Ton, Method A) - Minor Concrete For Crsp, Full Concrete Penetration (F), Concreted-Rock Slope Protection (1/4 Ton, Method A) - Minor Concrete For Cut Off Wall, Full Concrete Penetration (F), Concreted-Rock Slope Protection (1/4 Ton, Method A) - Minor Concrete For Grade Control Structure, Full Concrete Penetration (F), Temporary Fence (Type Cl-6), Temporary Sight Block/Windscreen, Chain Link Fence (Type Cl-6) Per Sbcfcd Special Drawings I And Ii, 20' Chain Link (Type Cl-6) Double Drive Gate Per Special Drawing I, 26' Chain Link (Type Cl-6) Double Drive Gate Per Special Drawing I, 4' Chain Link (Type Cl-6) Walk Gate Per Sbcfcd Special Draeing I, 30' Double Drive Pipe Gate Per Sbcfcd Standard Drawing Sp 209, Midwest Guardrail System (Wood Post And Block) With Round End Treatments And Minor Concrete Vegetation Control, Cable Railing Protection Barrier With Steel Posts, Minor Concrete (Drivable Access Ramp). See plans and specs for a complete list of bid items.

Lead Estimator: Bryan Lounsbury
Email: estimating@rivconstruct.com

Bid documents are available on Riverside Construction's plan room website atbids.rivconstruct.com

Riverside Construction Company, Inc is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker’s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum Participation.

Riverside Construction Company, Inc.
License No. 266222
4225 Garner Road Riverside, CA 92501
Phone: 951-682-8308 Fax: 951-682-5872

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run from date posted through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME