Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: Caltrans 08-1J2704
Project: Construction on State Highway In San Bernardino County In Yucca Valley From Route 62 To 0.4 Mile West Of Gin Road
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
DBE Goal: 23%
Bid Date: November 13, 2024, at 2:00 PM
Please submit all bids by 1:00 PM on 11/13/2024
Engineers Estimate: $26,000,000
General work description: Rubberized HMA, HMA (Type A), cold plane AC Pvmt & replace AC Surf.
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Develop Water Supply, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Portable Delineator, Portable Radar Speed Feedback Sign System, Temporary Barrier System, Portable Changeable Message Sign (Ea), Temporary Crash Cushion Tl-3, Temporary Traffic Screen, Job Site Management, Stormwater Pollution Prevention Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Soil Binder, Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Contractor-Supplied Biologist (Ls), Natural Resource Protection Plan, Remove Concrete (Cy), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Shoulder Backing, Structure Excavation (Rock Slope Protection), Move-In/Move-Out (Erosion Control), Bonded Fiber Matrix (Sqft), Class 2 Aggregate Base (Cy), Base Bond Breaker, Replace Asphalt Concrete Surfacing, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type D), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Remove Base And Surfacing, Jointed Plain Concrete Pavement (Rsc), Joint Seal (Preformed Compression), Structural Concrete, Headwall, (F) - Bar Reinforcing Steel, Rapid Setting Concrete (Patch), 57" X 38" Corrugated Steel Pipe Arch (.079" Thick), Reset Inlet, Concreted-Rock Slope Protection (Light, 150 Lb, Class Iii, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Temporary Desert Tortoise Fence, Delineator (Class 1), Pavement Marker (Retroreflective- Recessed), Marker (Culvert), Treatment Best Management Practice Marker, Remove Roadside Sign (Wood Post), Reset Roadside Sign, Furnish Laminated Panel Sign (1"-Type B), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Roadside Sign - One Post, Roadside Sign - Two Post, Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), (F) - Cable Railing, Alternative In-Line Terminal Tl-3, Buried Post End Anchor (Type B-S), Remove Guardrail, 6" Two-Component Paint Traffic Stripe, 8" Two-Component Paint Traffic Stripe, Two-Component Paint Pavement Marking, 12" Rumble Strip (Asphalt Concrete Pavement), Maintaining Existing Traffic Management System Elements During Construction, Radar Speed Feedback Sign Systems, Modifying Signal And Lighting Systems, Modifying Traffic Monitoring Stations, Mobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.
Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |