www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002

CE Focus - Focus Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date October 28, 2024 @ 1:10 p.m. through bid opening date

ARMSTRONG CAL BUILDERS INC. An Equal Opportunity Employer is seeking qualified DBE subcontractors goal for the following Project:

Bid Date and Time:

11/01/2024 2:00 PM (PDT)

Project Owner:

City of Laguna Beach

Project:

CIP 20-9969 Main Beach Park Renovation   

Wage Determination

Location:

Prevailing Wage

Laguna Beach, CA

Contact:

Bidding Dept.

Email Address:

bidding@armstrongcalbuilders.com

Estimator's Phone:

(800) 291‐7203

Participation

DBE Participation

Plans and Specs Link:

https://drive.google.com/drive/folders/1Fi5VDgvB569CKgi82ZZst27o1e-AuSG_?usp=sharing

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

General work description:  In general, the work comprises of removing existing lawn, concrete sidewalk and pavement; pruning roots; remove and replace plants, remove and place new furniture throughout the park, grading and updating landscape; modifying existing irrigation, and electrical improvements all within the City of Laguna Beach.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Mobilization , Pedestrian Access Plan , Construction Survey , Wpcp Stormwater Control Bmps , Construction Water, Clearing, Grubbing And Demolition , Concrete Demolition And Removal , Remove Bike Racks , Construct Concrete Paving – 4” Thick , Construct Concrete Paving – 6” Thick , Construct Pcc Drive Approach , Construct Pcc Curb Ramp (Case A) , Construct Pcc Curb Ramp (Case B) , Construct Pcc Retaining Curb, Remove And Replace Pullbox, Soil Preparation / Weed Abatement , Soil Amendment And Fine Grading , Regrading Turf Area , Furnish And Install 1 Gallon Plants , Furnish And Install 5 Gallon Plant , Furnish And Install 15 Gallon Plant , Remove And Stump Grind Palm Tree , Peel Back And Regrade Existing Turf Edge , Furnish And Install Sodded Turf , Furnish And Install Mulch (3” Thick Mulch), Over-Seed / Repair Existing Sod , Irrigation System – New And Modified, Remove And Relocate Bench Frames, Refurbish Existing Bench , Remove And Salvage Trash Receptacles , Remove And Salvage Recycle Receptacles , Furnish And Install Trash Receptacle , Furnish And Install Recycle Receptacle , Furnish And Install Trash Receptacle At Access Stairs To Beach , Furnish And Install Drinking Fountains , Furnish And Install Bike Rack , Furnish And Install Boardwalk Conduit Cover, Retrofit Bollard Light To Led , Furnish And Install Bollard Light , Concrete Light Pole Base , Furnish And Install – Marine Life Sign , Furnish And Install – Rules Sign , Relocate Existing Parking Meter Artwork, New Bollard Lighting Conduits And Wires, Lifeguard Tower Electrical , Furnish And Install 3” Drain Pipe , Furnish And Install Channel Drain , Paint Curb , 120-Day Plant Establishment, Allowance For Unforseen Conditions. See Specs for Complete list of bid items.

Armstrong Cal Builders Inc. requires 100% Performance & Payment Bonds. If requested, and as Armstrong Cal Builders Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Armstrong Cal Builders Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Armstrong Cal Builders Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications, and addenda regardless of any qualifying language in the proposal. Armstrong Cal Builders Inc. listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute Armstrong Cal Builders Inc. standard subcontract agreement if Armstrong Cal Builders Inc. is awarded the project; the standard subcontract is available for review at Armstrong Cal Builders Inc. office. At the discretion of Armstrong Cal Builders Inc. any listed subcontractor that withdraws its bid after Armstrong Cal Builders Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.

ARMSTRONG CAL BUILDERS INC.
Commercial & Residential Construction, Design Build
3130 E. Willow Street, Signal Hill, Ca 90755
Office: 800‐291‐7203
License No.: B 990992
An Equal Opportunity Employer

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 
What are we about? Contact us HOME