An Equal Opportunity Employer
Specialty Construction, Inc. Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Agency: County of Kern | Invitation No. 25007
Project: Sewer Segment Replacements in Ford City, CA
Bid Date: November 20, 2024, at 11:00 AM (PDT)
Engineers Estimate: $6,489,765.
DBE Goal: 0%
Plans and Specs are available at the following link: 24-037 - Sewer Segment Replacements, Ford City
Scope of Services: construction and replacement of the existing VCP sewer main pipe of various sizes with PVC SDR-35 pipe of various sizes, tie-ins to existing manholes, construction of new manholes, reconnection of existing laterals, backfill and compaction, and hot mix asphalt trench paving
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Develop Water Supply, Temporary Traffic Control, SWPPP, Trench Safety, Finishing Roadway, Class 2 Aggregate Base, 3/8" Pea Gravel, Hot Mix Asphalt (Trench Paving), Cold Plane Asphalt Concrete Pavement, Precast Concrete Manhole, Minor Concrete , PVC Sewer Trunk Line, Reconstruct Manhole Flowline, Demolish And Reconstruct Existing Manhole, Thermoplastic Traffic Stripe, Thermoplastic Pavement Markings, Mobilization
Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested DBE/MBE/WBE/SBE/SBRA/LSAF/HUB/MBE/WBE/SBE/SBRA/LSAF/HUB firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price. SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate. For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents
Specialty Construction, Inc.
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722
Contacts:
Tom Seidel: tseidel@specialtyconstruction.com
Sheri Shamblin: Shamblin@specialtyconstruction.com |