Project: Hilltop High School Technology Upgrades, San Francisco, CA
Agency: San Francisco Unified School District | Project No: 12418
Bid Date: December 11, 2024 at 2:00 PM
Technology Upgrade estimated construction is $510,890.00.
PA System Upgrades estimated construction is $657,792.00
The Project is generally described as including but not limited to: Technology and data upgrades that include but are not limited to the demolition of the existing MDF racks in Room 123 and the existing IDF racks in room 104A. A new MDF buildout in Room 123 and a new IDF build-out in room 104A, with additional electrical work to accommodate expansion; upgrading HVAC system; a reinforced concrete pad to support HVAC system; new data network equipment and connections to accommodate expanded technology requirements affecting the main building, classrooms, administrative offices, corridors, other service areas; installation of data, wireless and phone network equipment and systems; network racks and equipment with associated conduit, cabling, fiber, electrical wiring, and panels; demolition and removal of abandoned equipment and hazardous material removal.
Contract advertisement is posted on the District website at:
archive.sfusd.edu/en/doing-business-with-sfusd/current-invitations-for-bids.html
TRADES REQUESTED: Trades: Class B - *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors, C10 - High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, C7 - Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet
If you are unable to review the Specifications, Drawings or Addendum on the BidMail website, please contact us at estimating@angotti-reilly.com . We encourage all DBE, DVBE, LBE, MBE, SBE, WBE firms to submit BID proposals. |