REQUESTING SUB-BIDS ON ALL TRADES
From Qualified Subcontractors/Suppliers/Consultants/Trucking, expressly DBE
DBE Goal: 23%
For the following Caltrans Contract No. 12-0K8704, Federal-aid project STPLN-6212(032) for Construction on State Highway in Orange County in Los Alamitos from 0.8 Mile South to 0.2 Mile North of Katella Avenue Undercrossing in District 12 on Route 605.
All work categories are open for participation, including but not limited to those listed:
Ready Mix, Construction Area Signs, Portable Message Signs, Temporary Traffic Screen, Traffic Control System, Temporary Railing (K-Rail), Cold Plane Concrete Pavement, Remove Concrete, Clear and Grub, Roadway Excavation, Structure Excavation, Structure Backfill, Ditches Excavation, Roadside Clearing, Highway Planting, Rock Blanket, Irrigation, Temporary Construction Entrance, Temporary Erosion Control, Temporary Fiber Roll, Class 2 Aggregate Base, Class 3 Aggregate Base, Prime Coat, Hot Mix Asphalt, Place Hot Mix Asphalt Dike, Tack Coat, Portland Cement & Concrete Pavement, Furnish & Drive Cast-In-Steel Shell Concrete Piling, Cast-in-Drilled-Hole Concrete Piling, Concrete Structure , Minor Concrete Structure, Reinforcing Steel, Furnish & Install Sign Structure, Reinforced Concrete Pipe, Concrete Curb & Sidewalk-Miscellaneous, Midwest Guardrail System, Handrail, Concrete Barrier, Alternative Crash Cushion, Thermoplastic Traffic Striping & Marking, Temporary Traffic Striping, Signal & Lighting, Lighting, Ramp Metering System, QA/QC, Survey (Pre/Post Construction), Trucking - Super 10, Street Sweeping, Hazardous Waste Trucking, MSE Wall
BID DATE: January 9, 2025 by 2:00 PM
PLEASE SUBMIT QUOTES BY: January 6, 2025 by 5:00 PM
Plans & Specs are available by using the dropbox link:
https://www.dropbox.com/scl/fo/swm94zqzn3kainmcmqbtb/AO_sQLL5WRnwPg5E7aMg-Sk?rlkey=c90p49c3zpj4oad7p2ls0ywaf&st=eovmtj0k&dl=0
Contact: OHLA Estimating Department – Kevin Abbott ca.est@ohla-usa.com
Work performed under this Contract shall comply with all applicable terms, conditions and reporting requirements specified in Caltrans Standards and Special Provisions, including Buy America. OHLA is signatory to Operating Engineers, Laborers, Cement Masons and Carpenters Unions, non-signatory Subcontractors may be required to sign an agreement for trades covered under OHLA’s union agreements. Subcontractors may be required to provide 100% Payment and Performance Bonds from a surety acceptable to OHLA USA,Inc. OHLA USA, Inc. will reimburse for bond premium not to exceed 1% of subcontract. Please contact us for assistance. Assistance available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related assistance or services and technical assistance. Flexible time frames for performance, delivery and breaking out portions of work into economically feasible packages to encourage participation may be discussed. Additional assistance is available through the Caltrans Office of Civil Rights for more information visit www.dot.ca.gov/programs/civil-rights. OHLA USA, Inc. intends to conduct itself in “good faith” with all categories of disadvantaged, small, minority and women firms regarding participation on this project. Subcontractors are required to register with the Department of Industrial Relations (DIR), as required by Public Contract Code Section 1725.5, please furnish DIR Number with your quote submittal. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Quotations are to remain valid for the same duration as specified by Owner for contract award. Include applicable DBE certifications issued and validated by pertinent agencies. Potential Subcontractors and Partners will be required to sign OHLA’s standard subcontract, a copy is available upon request.
OHLA USA, Inc. is an Affirmative Action - Equal Opportunity Employer |