Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: City of Santa Barbara - Invitation #5068
Project: De La Vina Bridge Replacement Project
Project Location: The Project is located on De La Vina Street over Mission Creek between Vernon Road and Alamar Avenue
Plans & Specs: https://vendors.planetbids.com/portal/29959/bo/bo-detail/126391
DBE Goal: 18%
Bid Date: Thursday, March 13, 2025, at 3:00 PM(PST)
Please submit all bids by 1:00 PM on 3/13/2025

General work description:  The De La Vina Street Bridge is structurally deficient and is to be replaced with a new bridge designed to current City, American Association of State Highway and Transportation Official, and Caltrans standards, while minimizing adverse effects on Mission Creek and protecting, preserving, and enhancing its adjacent riparian habitat. The work includes all labor, materials, supervision, plant, and equipment necessary to complete and deliver the finished bridge replacement project per plans and specs.

Estimating Dept.
Email: estimating@papichconstruction.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Construction Survey, Progress Schedule (Critical Path Method), Construction Area Signs, Traffic Control System, Temporary Pavement Marking(Paint), Temporary Pavement Striping(Paint), Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Erosion Control Measures, Temporary Creek Diversion, Building Removals - 2726 De La Vina Street, Building Removal - 2735 De La Vina Street, *Remove Hardscape (Miscellaneous) (2726 & 2735 Dlv St.), Clearing And Grubbing, *Roadway Excavation, *Channel Excavation, *Structure Excavation (Bridge), *Structure Excavation (Rsp), *Structure Excavation (Solider Pile Wall), *Structure Backfill (Bridge), *Structure Backfill (Solider Pile Wall), Downstream Landscape Planting, Plant Establishment (180 Days), Downstream Irrigation System, Class Ii Aggregate Base, Slurry Seal (Type Ii), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt (Miscellaneous Area) "Presto Pasta Lot", Cold Plane Asphalt Concrete Pavement, Temporary Shoring, Furnish W14 X 311 Pile (Soldier Pile Wall), Install W14 X 311 Pile In 30" Cidh With Concrete Backfill (Soldier Pile Wall), *Structural Concrete, Bridge Footing, *Structural Concrete (Bridge & Wingwalls) (Colored), *Structural Concrete, Bridge(Polymer Fiber), Structural Concrete, Channel Wall (Soldier Pile Wall & Architectural Cap) (Colored), *Structural Concrete (Retaining Wall), *Architectural Treatment, Furnish 3-Foot Wide Precast Prestressed Concrete Girder, Furnish 4-Foot Wide Precast, Prestressed Concrete Girder, *Erect Precast Prestressed, Concrete Girder, Joint Seal, Type A (Mr = 5/8"), *Bar Reinforcing Steel (Bridge), *Bar Reinforcing Steel (Channel Wall & Architectural Cap), *Bar Reinforcing Steel(Retaining Wall), Remove Retaining Wall(Concrete), Remove Channel Retaining Wall(Concrete), Remove Channel Retaining Wall(Grouted Rock), Bridge Removal, 8-Inch Plastic Pipe (Ss), 12-Inch Plastic Pipe (Sd), 15-Inch Plastic Pipe (Ss), 18-Inch Plastic Pipe (Sd), 24-Inch Plastic Pipe (Sd), 3-Inch Plastic Pipe (Sd), Cultec Stormwater Chamber Systems, Ca D72B Drainage Inlet, Type G1, Drop Inlet Type 2 (Modified 5'Wide) (City Std D-01.2), Drop Inlet Type 2 (Modified 12'Wide) (City Std D-01.2), 24" Sewer Manhole (Mh-5) (City Std S-Mh3 & City Std S-Mh13), 36" Storm Drain Manhole (Sppwc 324-2), 36" Sewer Manhole (Mh-1 & Mh-4) (City Std S-Mh1), Remove Pipe (Storm Drain) (Size &Type Varies), Remove Or Abandon Pipe(Sewer), Remove Drainage Inlet, Adjust Utility Cover To Grade, Remove Channel Slope Paving(Concrete), *Rock Slope Protection (1 Ton, Class Viii, Method A), *Rock Slope Protection (20 Lb, Class I, Method B), Detectable Warning Surface Minor Concrete (Curb And Gutter), Minor Concrete (Commercial Driveway) (City Std H-03.1), Minor Concrete (Sidewalk), Minor Concrete (Ramp), Minor Concrete (Island & Brick Pavers), Remove Concrete Sidewalk, Remove Concrete (Curb And Gutter), Manhole Frame And Cover, *Miscellaneous Metal (Bridge), Water System Modifications, Temporary Sanitary Sewer Bypass System (Sewer Siphon & Mh-5), Sanitary Sewer Siphon System, Gas Line Permanent Relocation Assistance (Scg), Electrical Line Permanent Relocation Assistance (Sce), Paint Curb (2-Coat), Chain Link Fence (Cl-6), *Ornamental Double Gate (10 Ft Wide), Remove Fence (Wood), Remove Chain Link Fence, 6 Ft Wooden Board Fence (Match Existing), Remove Roadside Sign, Roadside Sign - One Post, Midwest Guardrail System (Wood Post), *Ornamental Railing, *Concrete Barrier (Texas Dot C411), Remove Guardrail, Remove Metal Railing, Thermoplastic Pavement Striping, Marking And Retroreflective Markers, Lighting System (Street), Install Pedestrian Hybrid Beacon Systems (City Furnished), Water Meter Charges, Mobilization, Federal Trainee Program, Utility Coordination

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 