
Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: Caltrans No. 05-1N3404
Project: Construction on State Highway In San Luis Obispo County At Various Locations From Broad Street Exit 202b To California Boulevard Exit 203c.
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=05-1N3404
DBE Goal: 20%
Bid Date: Tuesday, March 25, 2025, at 2:00 PM
Quotes Due by 1:00 PM 03/25/25
General work description: Minor concrete, vegetation control, guardrail, and landscaping.
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Time-Related Overhead (Wday), Construction Area Signs, Traffic Control System, Channelizer (Surface Mounted), Traffic Drum, Portable Flashing Beacons (Ea), Temporary Barrier System, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Tl-3, Job Site Management, Stormwater Pollution Prevention Plan, Stormwater Sampling And Analysis Day, Stormwater Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Noise Monitoring, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Roadway Excavation (Type Com) (Aerially Deposited Lead), Roadside Clearing, Packet Fertilizer, Plant (Group F), Plant (Group A), Plant Establishment Work, Wood Mulch, Check And Test Existing Irrigation Facilities, Control And Neutral Conductors, 1 1/2" Remote Control Valve, 2" Remote Control Valve, 1 1/2" Wye Strainer Assembly, Riser Sprinkler Assembly (Gear Driven), Pop-Up Sprinkler Assembly (Gear Driven), 2 1/2" Gate Valve, (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), (F) - 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Class 315) (Supply Line), (F) - 2 1/2" Plastic Pipe (Class 315) (Supply Line), (F) - 4" Plastic Pipe (Class 315) (Supply Line), Casing Insulators, Pressure Regulating Valve, Ball Valve, 10" Corrugated High Density Polyethylene Pipe Conduit, Compost (Cy), Class 2 Aggregate Base (Cy), Minor Hot Mix Asphalt, Place Hot Mix Asphalt (Miscellaneous Area), Remove Asphalt Concrete Dike, Remove Junction Box, Minor Concrete (Stamped Concrete), Adjust Access Box (Utility), Remove Pavement Marker, Delineator (Class 1), Pavement Marker (Retroreflective), Object Marker, Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Midwest Guardrail System (Steel Post), Vegetation Control (Crushed Shale), Double Midwest Guardrail System (Steel Post), Rail Tensioning Assembly, End Anchor Assembly (Type Sft-M), Alternative Crash Cushion Tl-2, Crash Cushion (Tau-M) Tl-2, Alternative In-Line Terminal Tl-3, Alternative Crash Cushion Tl-3, Concrete Barrier (Type 60M), Concrete Barrier (Type 60Mc), Remove Guardrail, Remove Crash Cushion, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, 8" Traffic Stripe Tape (Broken 12-3), 6" Traffic Stripe Tape (Warranty) (Broken, 17-7), Maintaining Existing Traffic Management System Elements During Construction, Mobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |