www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date March 5, 2025 @ 4:35 p.m. through bid opening date

Armstrong Cal Builders An Equal Opportunity Employer is seeking qualified DVBE subcontractors, suppliers for the following project.

Bid Date and Time:

March 14, 2025, at 12:00 P.M.

Project Owner:

Long Beach Unified School District |FS419-2425/RFP

Project:

Food Service Equipment Labor & Installation

Wage Determination

Prevailing Wage

Location:

Los Angeles County, CA

Contact:

Bidding Dept.

Email Address:

bidding@armstrongcalbuilders.com

Estimator's Phone:

(657) 332-2300

Participation

3% DVBE Goal & EE is $1,657,571.00

Plans and Specs Link:

https://drive.google.com/drive/folders/1xHN_SL4vpKBh_yH2LXKWMFEDiW9Mo6M5?usp=sharing

1. Remodel area 7,700 S.F
2. Replacement of existing cook/chill equipment with new system and individual refrigeration
system
3. Accessible Upgrades:
a. Remove two existing single drinking fountains and replace them with one accessible
accessible wall-mounted high-low drinking fountain and bottle filler.
b. Provide one accessible hand sink
c. Provide one kick plate at existing door
d. Provide tactile exit signs and room ID sign
4. Associated Site Work:
a. Provide to away sign
5. Food Service Equipment:
a. Electric Hoist
b. Drain, Floor Trough
c. Tilting Cooking Vessel

d. Stainless Steel Manifold
e. Central Router
f. Titling Cooking Vessel
g. Agitator Storage Cart
h. Bagger Accessory Cart
i. Film Cart
j. Stationary Pack Tank
k. Bagger and Sealer
l. Conveyor
m. Batch Chiller
n. 3 Compartment Sink
o. Ice Builder
p. Remote Compressor Rack
q. Cooler Refrigeration System
r. Refrigeration Rack, 6 Units
s. Hand Sink
t. LED Recessed Hood Light Fixture
6. Plumbing Upgrades
a. Provide Water, Waste, Vents and Gas Piping

Scope of Services The existing cook/chill equipment will be replaced with a new system, including individual refrigeration units. Additionally, accessibility upgrades will be made, including improvements to restrooms, drinking fountains, and signage.

Please see the NIB or Specification section for the subcontractor’s prequalification requirements.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: ALL ITEMS ARE OPEN FOR BID. SEE PLANS & SPECS FOR A COMPLETE LIST OF ITEMS

Armstrong Cal Builders Inc. requires 100% Performance & Payment Bonds. If requested, and as Armstrong Cal Builders Inc. way of assisting subs in obtaining bonds, lines of credit and insurance in the preparation of this project, we can initiate introduction to agents known to us. Armstrong Cal Builders Inc. can also assist in obtaining equipment, supplies, materials or related assistance or services in the preparation of this project. Armstrong Cal Builders Inc. is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope found in the plans, specifications, and addenda regardless of any qualifying language in the proposal. Armstrong Cal Builders Inc. listing of a subcontractor is not an acceptance of any or all of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications.

Each listed subcontractor must execute Armstrong Cal Builders Inc. standard subcontract agreement if Armstrong Cal Builders Inc. is awarded the project; the standard subcontract is available for review at Armstrong Cal Builders Inc. office. At the discretion of Armstrong Cal Builders Inc. any listed subcontractor that withdraws its bid after Armstrong Cal Builders Inc. submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work.

This is a prevailing wage project. If this project is subject to a Project Labor Agreement or Project Stabilization Agreement, you will be required to honor the terms of such agreement.

Armstrong Cal Builders Inc.
Commercial & Residential Construction, Design Build
Office Address: 8031 Main Street Stanton CA 90680
PO Box 249 Stanton CA 90680
Office Number: 657-332-2300
License No.: B 990992
An Equal Opportunity Employer

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME