www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date March 14, 2025 @ 4:00 p.m. through bid opening date

 

Griffith Company Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency: Los Angeles World Airports (LAWA) / RFP No. 0139-2025-02-RFB-220706
Project: Taxiway Reconstruction Project (Taxiways C,H,M,N,P)
Bids open: Thursday, April 10, 2025, at 2:00pm PST
DBE Goal: 15%
Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/d4owut3gnclo2ycefo35u/ADdBA_OwppgdS-3EI8WBppU?rlkey=ccrh1l1fp347ekcobmnffli35&st=gf5aosdj&dl=0

The Taxiway Reconstruction project will reconstruct five segments of connector taxiways to Runway 16R-34L. Taxiway C, N and P connectors to the east of Runway 16R-34L and also segments of Taxiway H and M connectors to the west. These Taxiway segments also connect to either the adjacent Runway 16L-34L or adjacent Taxiway A or B.

Taxiway Reconstruction Scope of Work:
Replacement of taxiway and shoulder pavements
Reconfigure taxiway intersections to meet FAA design standards
Replacement of taxiway lighting systems
Airfield signage modifications
Various grading and drainage improvements

Scope of Work:
Potholes - Paved Areas, Remove Existing Painted Pavement Markings, Remove Grout Filled Storm Pipe, Remove Storm Drain Structure, Remove Asphalt Concrete (8" or Less), Cold Mill Asphalt Pavement (3" Deep by 12" Wide) for Transition Overlay, Clearing and Grubbing, Unclassified Excavation, Subgrade Improvement, Subgrade Preparation, Subgrade Stabilization Geosynthetic(s), Base Stabilization Geosynthetics, Crushed Aggregate Base Course (P-209) - 11 Inch, Crushed Aggregate Base Course (P-209) - 16.5 Inch, Hot Mix Asphalt Pavement (P-401) - PG 76-22M (Surface Coarse), Hot Mix Asphalt Pavement (P-401) - PG 64-10 (Base Coarse), Cement Concrete Pavement Slab Replacement, Spall Repair – Small, Double Swing AOA Gate, 18" Polypropylene Dual Wall Pipe, 4'X4' Aircraft Rated Storm Inlet, Bubbler Outlet Structure, Hydroseeding, Airfield Markings - Permanent – Reflectorized, Airfield Markings - Permanent - Non-Reflectorized, Airfield Markings – Temporary, Airfield Markings - Refresh Existing, Remove Miscellaneous Electrical Items, Remove Airfield Lighting Cable, Modifications to the airfield Lighting Control System, Install New L-858(L) Airfield Guidance Sign 1-MOD on New Foundation, Reinstall Existing L-858(L) Airfield Guidance Sign with New Panels on New Foundation (Any Size), Remove and Reinstall Existing Taxiway Centerline Light L-852D(L) and Existing Transformer, Install New Taxiway Centerline Light L-852C(L) and New Transformer, Install New Taxiway Centerline Light L-852D(L) and New Transformer, Install New Taxiway Edge Light L-861T(L) and New Transformer, Remove and Reinstall Existing Taxiway Edge Light L-852T(L) with Existing Transformer, Install New Inpavement Runway Guard Light L-852G(L) and New Transformer, Remove and Reinstall Existing Elevated Runway Guard Light L-804(L) and Existing, Remove and Reinstall Existing Elevated Runway Edge Light L-850C(L) and Existing Transformer, Remove and Reinstall Existing Elevated Runway Edge Light L-862(L) and Existing Transformer, Install New L-868B Extension and Spacer Package, Install New L-867B Base Can in New Pavement, Install New L-867B Base Can in Existing Pavement, Install New L-868B Base Can in New Pavement, Aircraft Rated Cover Plate on Existing Base Can, #8 AWG, 5KV, Black or Red, Type L-824 Unshielded Cable, #6 AWG, 600V, Insulated Green Ground Wire, Stranded, 1-2” PVC Concrete-Encased Conduit in New Pavement, 1-3” PVC Concrete-Encased Conduit in New Pavement, 1-2” PVC Concrete-Encased Conduit in Non-Paved, 1-3” PVC Concrete-Encased Conduit in Non-Paved Earth, 1-2” PVC Concrete-Encased Conduit in Existing Pavement, 4'x4'x4' Aircraft Rated Handhole, Temporary Electrical Work, Miscellaneous Electrical Work, Unforeseen Conditions, Utility Investigation, Hazardous Materials Mitigation, Airfield Operational Requirements, Airfield Lighting Control System Modifications, Remove Existing Painted Pavement Markings, Remove Storm Pipe, Remove Storm Drain Structure, Remove Asphalt Concrete (8" or Less), Cold Mill Asphalt Pavement (3" Deep by 12" Wide) for Transition Overlay, Clearing and Grubbing, Unclassified Excavation, Subgrade Improvement, Subgrade Preparation, Subgrade Stabilization Geosynthetic(s), Base Stabilization Geosynthetic(s), Crushed Aggregate Base Course (P-209) - 11 Inch, Crushed Aggregate Base Course (P-209) - 16.5 Inch, Hot Mix Asphalt Pavement (P-401) - PG 76-22M (Surface Coarse), Hot Mix Asphalt Pavement (P-401) - PG 64-10 (Base Coarse), Hydroseeding, Airfield Markings - Permanent – Reflectorized, Airfield Markings - Permanent - Non-Reflectorized, Airfield Markings – Temporary, Airfield Markings - Refresh Existing, Remove Miscellaneous Electrical Items, Remove Airfield Lighting Cable, Remove Conduit/Ductbank (All Types), Remove Guidance Sign and Foundation (All Sizes), Remove Base Can (All Types), Install New L-858(L) Airfield Guidance Sign 4-MOD on New Foundation, Remove and Reinstall Existing Taxiway Centerline Light L-852D(L) and Existing Transformer, Install New Taxiway Edge Light L-861T(L) and New Transformer, Remove and Reinstall Existing Elevated Runway Guard Light L-804(L) and Existing Transformer, Remove and Reinstall Existing Inpavement Runway, Edge Light L-850C(L) and Existing Transformer, Install New L-868B Extension and Spacer Package, Install New L-867B Base Can in New Pavement, Install New L-867B Base Can in Existing Pavement, Install New L-868B Base Can in New Pavement, Aircraft Rated Cover Plate on Existing Base, #8 AWG, 5KV, Black or Red, Type L-824 Unshielded Cable,   #6 AWG, 600V, Insulated Green Ground Wire (Stranded), 1-3” PVC Concrete-Encased Conduit in New Pavement, 1-2” PVC Concrete-Encased Conduit in Existing Pavement, Temporary Electrical Work, Miscellaneous Electrical Work, Remove Existing Painted Pavement Markings, Remove Asphalt Concrete (8"" or Less), Cold Mill Asphalt Pavement (3"" Deep by 12"" Wide) for Transition Overlay, Clearing and Grubbing, Unclassified Excavation, Subgrade Improvement, Subgrade Preparation, Subgrade Stabilization Geosynthetic(s), Base Stabilization Geosynthetic(s), Crushed Aggregate Base Course (P-209) - 11 Inch, Crushed Aggregate Base Course (P-209) - 16.5 Inch, Hot Mix Asphalt Pavement (P-401) - PG 76-22M (Surface Coarse), Hot Mix Asphalt Pavement (P-401) - PG 64-10 (Base Coarse), Hydroseeding, Airfield Markings - Permanent – Reflectorized, Airfield Markings - Permanent - Non-Reflectorized, Airfield Markings – Temporary, Airfield Markings - Refresh Existing, Remove Miscellaneous Electrical Items, Remove Airfield Lighting Cable, Reinstall Existing L-858(L) Airfield Guidance Sign with New Panels on New Foundation (Any size), Install New Taxiway Edge Light L-861T(L) and New Transformer, Remove and reinstall Existing Elevated Runway Guard Light L-804(L) and Existing Transformer, Install New Inpavement Runway Edge Light L-850C(L) and New Transformer, Install New L-868B Extension and Spacer Package, Install New L-867B Base Can in New Pavement, Install New L-868B Base Can in New Pavement, Aircraft Rated Cover Plate on Existing Base Can, #8 AWG, 5KV, Black or Red, Type L-824 Unshielded Cable, #6 AWG, 600V, Insulated Green Ground Wire, Stranded, 1-2” PVC Concrete-Encased Conduit in New Pavement, 1-2” PVC Concrete-Encased Conduit in Existing Pavement, Trucking, Equipment Rental.

Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer

Griffith Company
License 88
3050 E. Birch Street,  Brea CA 92821
Phone 714/984-5500 Fax 714/854-0228

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME