www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date July 3rd, 2024 @ 11:20 a.m. through bid opening date

*REQUEST FOR DBE SUBCONTRACTORS, SUPPLIERS & SERVICES*

CALTRANS CONTRACT #: 01-0H5504    BID DATE: 7/31/24 @ 2:00PM
LOCATION: MENDOCINO COUNTY ON ROUTE 101 NEAR LONGVALE, CA
GENERAL DESCRIPTION: HMA, RHMA, COLD PLANE AC PAVEMENT
PHONE: (707) 443-6371 FAX: (707) 443-0277
ESTIMATOR: KODY KING Please send quotes to: ccoppini@mercerfraser.com

***Addendum 1 issued 07/17/24***
***Addendum 2 issued 07/23/24***
***Addendum 3 issued 07/26/24***

https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=01-0H5504

Mercer-Fraser Company is seeking quotes for the following items of work: LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, MOVE-IN/MOVE-OUT (TEMP EROSION CONTROL), TEMP MULCH, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP REINFORCED SILT FENCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, SHOULDER BACKING, IMPORTED BORROW, WOOD MULCH, ROLLED EROSION CONTROL PRODUCT, CRACK TREATMENT, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, ENTRANCE TAPER, REMOVE ENTRANCE TAPER, REMOVE OVERSIDE DRAIN, MODIFY INLET, FRAME & GRATE, CHAIN LINK FENCE, CHAIN LINK GATE, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER, REMOVE ROADSIDE SIGN, RELOCATE SIGN PANEL, FURNISH LAMINATED PANEL SIGN, FURNISH SINGLE SHEET ALUMINUM SIGNS, ROADSIDE SIGNS, INSTALL ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), VEGETATION CONTROL MAT, SINGLE THRIE BEAM BARRIER, TRANSITION RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, ALTERNATIVE CRASH CUSHION, REMOVE & RECONSTRUCT GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), RUMBLE STRIP, SINUSOIDAL RUMBLE STRIP GROUND-IN INDENTATIONS, RUMBLE STRIP, SINUSOIDAL RUMBLE STRIP GROUND-IN INDENTATIONS, TRAFFIC STRIPE TAPE WITH CONTRAST, MODIFYING TRAFFIC MONITORING STATIONS, REMOVING TRAFFIC MONITORING STATIONS

GENERAL REQUIREMENTS: Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME