www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date September 9, 2024 @ 4:37 p.m. through bid opening date

Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:

Agency: Caltrans 05-1Q03U4
Project: Construction on State Highway In San Luis Obispo And Kern Counties Near Cholame From 2.0 Miles East Of Antelope Road To 0.4 Mile East Of The Kern County Line
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
DBE Goal: 22%
Bid Date: October 9, 2024, at 2:00 PM
Please submit all bids by 1:00 PM on 10/9/2024
Engineers Estimate: $4,600,000

General work description: Vertical curve and extend existing truck climbing lane.

***Addendum 1 issued***

Estimating Dept.
Email: estimating@papichconstruction.com

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Construction Area Signs, Traffic Control System, Flashing Arrow Sign, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Temporary Pavement Marker, Temporary Barrier System, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Automated Flagger Assistance Device Day, Job Site Management, Stormwater Pollution Prevention Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Large Sediment Barrier, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Invasive Species Control, Clearing And Grubbing (Ls), Roadway Excavation, Rolled Erosion Control Product (Netting), Hydroseed, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Cold Plane Asphalt Concrete Pavement, (F) - Structural Concrete, Box Culvert, (F) - Structural Concrete, Headwall, (F) - Structural Concrete, Drainage Inlet, (F) - Bar Reinforcing Steel, 24" Alternative Pipe Culvert, Remove Culvert (Lf), Remove Inlet, Remove Headwall, Remove Flared End Section (Ea), (F) - Miscellaneous Iron And Steel, Fence (Type Wm, Modified, 4'), Remove Pavement Marker, Delineator (Class 1), Pavement Marker (Retroreflective), Treatment Best Management Practice Marker, Object Marker, Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, (F) - Cable Railing, Remove Guardrail, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 12" Rumble Strip (Asphalt Concrete Pavement), 6" Traffic Stripe Tape (Warranty) (Broken, 36-12), Modifying Traffic Monitoring Stations, Mobilization

Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.

Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME