Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: Caltrans 09-374704
Project: Construction on State Highway In Inyo County In And Near Bishop On Route 395 From 0.1 Mile South Of Jay Street To Barlow Lane And On Route 168 From Pioneer Lane To Route 395
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.phpDBE
Goal: 20%
Bid Date: Wednesday, October 23, 2024 at 2:00 PM
Engineers Estimate: $17,600,000.
General work description: HMA (Type A), minor concrete, and lighting.
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Type Iii Barricade, Temporary Traffic Stripe (Paint), Portable Delineator, Portable Flashing Beacons (Ea), Temporary Barrier System, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Module, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Large Sediment Barrier, Street Sweeping, Temporary Concrete Washout, Temporary Creek Diversion Systems, Contractor-Supplied Biologist (Ls), Natural Resource Protection Plan, Fish Protection, Remove Bollard, Salvage Dedication Plaque, Remove Planter Box, Clearing And Grubbing (Ls), Roadway Excavation, Imported Borrow (Cy), Roadside Clearing, Prune Existing Plants, Cultivation, Soil Amendment, Organic Fertilizer, Packet Fertilizer, Plant (Group A), Plant (Group B), Maintain Existing Planted Areas, Wood Mulch, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Salvage Irrigation Facility, Control And Neutral Conductors, Battery Powered Irrigation Controller, (F) - 2" Copper Pipe (Supply Line), (F) - 3/4" Drip Irrigation Tubing, 2" Backflow Preventer Assembly, Drip Valve Assembly, 1" Gate Valve, (F) - 1" Plastic Pipe (Schedule 40) (Supply Line), (F) - 2" Plastic Pipe (Class 315) (Supply Line), Pvc Pipe Conduit, (F) - Pvc Pipe Conduit (Sleeve), Imported Topsoil (Cy), Fiber Reinforced Matrix (Sqft), Fiber Rolls, Compost (Cy), Incorporate Materials, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Joint Seal (Preformed Compression), (F) - Structural Concrete, Retaining Wall, (F) - Structural Concrete, Box Culvert, (F) - Structural Concrete, Drainage Inlet, (F) - Bar Reinforcing Steel (Retaining Wall), (F) - Bar Reinforcing Steel (Box Culvert), 18" Alternative Pipe Culvert, 24" Alternative Pipe Culvert, 42" Alternative Pipe Culvert, (F) - Concrete Backfill (Pipe Trench), Under Sidewalk Drain, 24" Corrugated Steel Pipe (.138" Thick), 18" Slotted Corrugated Steel Pipe (.168" Thick), 18" Alternative Flared End Section, Remove Culvert (Lf), Remove Inlet, Remove Headwall, Remove Manhole, Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Curb) (Cy), (F) - Minor Concrete (Type A2-6 Modified-T Curb), Minor Concrete (Curb Type A2-6 Modified), Detectable Warning Surface, Minor Concrete (Miscellaneous Construction), Minor Concrete (Driveway), Minor Concrete (Sidewalk), Minor Concrete (Curb Ramp), Remove Concrete (Curb, Gutter, And Sidewalk) (Cy), Remove Concrete Pavers, Pre/Post Construction Surveys, (F) - Miscellaneous Iron And Steel, Manhole Frame And Cover, Utility Box Frame And Cover, Fire Hydrant Relocation (City Of Bishop), Adjust Monument Cover To Grade, Adjust Access Box Frame And Cover (Utility), Adjust Access Box (Utility), Adjust Manhole Frame And Cover (Utility), Paint Curb (2-Coat), Flagpole Sleeve, Reset Horse Teether Ring, Relocate Mailbox, Fence (Type Bw, 4-Strand, Metal Post), Fence (Type Bw, 6-Strand, Metal Post), Temporary Fence (Type Cl-6), Chain Link Fence (Type Cl-6, Extension Arm), 12' Chain Link Gate (Type Cl-6), Remove Fence (Type Bw), Remove Chain Link Fence, Relocate Gate, Remove Roadside Sign, Remove Sign Post, Reset Milepost Marker, Reset Roadside Sign, Reset Roadside Sign (Turnable Metal Post) (Ea), Relocate Roadside Sign, Relocate Sign Panel, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Roadside Sign - One Post, (F) - Cable Railing, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 6" Methyl Methacrylate Paint Traffic Stripe, 6" Methyl Methacrylate Paint Traffic Stripe (Broken 6-1), 6" Methyl Methacrylate Paint Traffic Stripe (Broken 17-7), 6" Methyl Methacrylate Paint Traffic Stripe (Broken 36-12), 6" Methyl Methacrylate Paint Traffic Stripe (Broken 8-4), 8" Methyl Methacrylate Paint Traffic Stripe, Methyl Methacrylate Paint Traffic Stripe Crosswalk And Pavement Marking, 8" Methyl Methacrylate Paint Traffic Stripe (Broken 6-1), Maintaining Existing Traffic Management System Elements During Construction, Pull Box (Ea), Lighting System, Rectangular Rapid Flashing Beacon Systems, Modifying Lighting Systems, Modifying Signal And Lighting Systems, Modifying Traffic Monitoring Stations, Modifying Changeable Message Sign Systems, Modifying Interconnection Conduit And Cable, Mobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.
Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |