www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date August 20, 2024 @ 4:25 p.m. through bid opening date


Griffith Company Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:

Agency: SANDAG Federal Project # ATPL-6066(151)
Project: North Park/Mid-City Bikeways - University Bikeway | Project CIP 1223081
DBE Goal: 23%
Estimated Bid Value: $23,896,800.75
Bids open October 24, 2024, at 2:00 PM

General work description: The work consists in general of approximately 2.8 miles of Class II and Class IV bikeway along University Avenue between Estrella Avenue and 70th Street within the City of San Diego and the City of La Mesa and approximately 0.25 miles of Bike Boulevard improvements on Estrella Avenue between Orange Avenue and University Avenue. Roadway improvements are required to accommodate the bikeway. Features include raised concrete medians, concrete curb & gutter, asphalt concrete dike, bus islands, a protected intersection, street lighting, traffic signal modifications and other traffic safety measures linked to signage and striping.

Project Plans & Specs:
https://www.dropbox.com/scl/fo/ubydpya0wxbknl5463q0u/ANIsSmWwMA32MrykUrkAdU4?rlkey=gjefywue9mcu5a8ewt6d0e9sg&st=g0yg1qy2&dl=0

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Mobilization / Demobilization, Time Related Overhead, Progress Schedule, Surveying and Construction, Staking, Traffic Control and Stage Construction, Erosion Control per SWPPP and NPDES General Construction Permit, including, Preparation of SWPPP, Implementation, Maintenance, Management, and Compliance, ADL Hauling and Disposal (Cal-Haz), Excavation and Transportation Plan (ADL), Lead Compliance Plan (ADL), Furnish and Install Project Information Signs, Street Sweeping, Unclassified Excavation, Unsuitable Material, Remove and Dispose Landscaping and Minor PCC, Remove and Dispose Asphalt Pavement and Base, Remove and Dispose PCC Median, Curbs, Gutters, PCC Pavement, Walks and Base, Cold Mill Asphalt Pavement, Sawcut, Remove and Dispose Existing Retaining Wall, Remove and Dispose Trash Receptacle, Remove and Salvage Trash Receptacle, Remove and Dispose Bus Stop Sign Pole, Remove and Dispose Bus Shelter, Remove and Dispose Fence, Remove and Salvage Bike Rack, Remove and Dispose Gate Valve, Remove and Dispose Fire Hydrant, Remove and Dispose Air/Vac, Adjust Utility Structure to Finish Grade, Adjust Pull Box to Finish Grade, Adjust Manhole to Finish Grade, Remove and Replace Pull Box, Remove and Dispose Trees, Remove and Dispose Sidewalk Underdrain, Remove and Dispose RCP Storm Drain, Remove and Dispose Storm Drain Inlet, Remove and Dispose Existing AC Dike, Remove Water Meter and Backflow, Construct 4" PCC Sidewalk per SDPWC SDG-155, SDG-156 and SDRSD G-9, G-10, Construct PCC Truck Apron, Construct 2" PCC Mountable Curb, Construct Type B-2 PCC Median Curb and Gutter per SDPWC SDG-154 (All Types), Construct Modified Type B-2 PCC Median Curb and Gutter per SDPWC SDG-154 with 6" Gutter Pan, Construct PCC Curb per SDPWC SDG-150  (All Types), Construct PCC Curb and Gutter per SDPWC SDG-151 (All Types), Construct PCC Retaining Curb (All Types), Construct Type A PCC Gravity Retaining Wall per SDRSD C-09, Construct PCC Curb Ramp (All Types), Construct PCC Ribbon Gutter, Construct PCC Passageway per SDPWC SDG-139, Construct Detectable Edge, Furnish and Install Detectable Warning Tiles per SDPWC SDG-130, Construct Trench Drain with Grates (W=18"), Construct Trench Drain with Grates (W=24"), Construct PCC Cross Gutter per SDPWC SDG-157, Construct 4" Integral Colored PCC Bike Path w/ Keyed Joint per SDRSD G-10, Construct 4" Integral Colored PCC Bike Ramp, Construct Pavement Section Type A (TI=10.5, R-Value=0 to 9.9), Construct Pavement Section Type B (TI=10.5, R-Value=50), Construct Pavement Section Type C (TI=5, R-Value=0 to 9.9), Construct Pavement Section Type D (TI=5, R-Value=50), Place Asphalt Overlay with Reinforcing Fibers, Construct 9" PCC Bus Stop Slab per SDPWC SDG-102, Place Slurry Seal, Construct PCC Commercial Driveway per SDPWC SDG-163, Construct Type A Asphalt Dike per SDRSD G-05, Furnish and Install Bus Stop Railing, Furnish and Install Protective Railing Per SDPWC SDG-140, Construct 9" PCC (560-C-3250) on Geogrid, Furnish and Install 4' High Green Vinyl Coated Chain Link Fence per SDPWC SDM-112, Construct Speed Cushion, Perform Soil Prep, Perform Agricultural Soil Testing and Perc Test, Furnish and Install Rock Mulch and Rock Cobble, Furnish and Install Decomposed Granite, Furnish and Install Turf, Furnish and Install Aluminum Metal Header, Furnish and Install 24" Box Tree, Furnish and Install 5 Gallon Shrub, Furnish and Install Boulder 4'-0", Furnish and Install Boulder 3'-0", Furnish and Install Irrigation System Appurtenances, Furnish and Install Backflow Preventer and Cage, Furnish and Install 1" Water Service per SDPWC SDW-150, Furnish and Install 1" Master Valve w/ Valve Box, Furnish and Install 1" Flow Sensor w/ Valve Box, Furnish and Install 1" RCV w/ Valve Box, Furnish and Install 1.5" RCV w/ Valve Box, Furnish and Install 1" PRV w/ Valve Box, Furnish and Install Quick Coupler w/ Valve Box, Furnish and Install Drip Irrigation Flush Valve w/ Valve Box, Furnish and Install Tree Bubbler Assembly, Furnish and Install PVC Class 315 Mainline Pipe, Furnish and Install Irrigation Low Voltage Wiring, Furnish and Install Sch 40 PVC Pipe (3/4" - 1-1/2"), Furnish and Install Sch 80 PVC Pipe Sleeving, Furnish and Install Control Wire in 2" Sch 40 PVC Conduit, Perform 4-Month Landscape Establishment, Perform 20-Month Landscape Maintenance, Furnish and Install Bike Rack, Furnish and Install Salvaged Trash Receptacle, Furnish and Install 18" RCP, Construct Curb Inlet Type B per SDD-116, Construct Curb Inlet Type B per SDD-116 (Modified V=29'), Construct Cleanout Type A-4 per SDRSD D-9, Construct Catch Basin Type I per SDRSD D-29 (Modified), Construct Curb Inlet Type B-1 per SDD-116, Construct Curb Inlet Type B-1 per SDD-116 (Modified), Adjust to Grade Existing Grate at 60th Street, Furnish and Install Custom Grate (3.5' by 4.5") at 100' East of Rolando Boulevard, Construct Modified Curb Outlet & Inlet per D-25B and SDD-115, Furnish and Install 6" PVC for MWS Bypass, Furnish and Install 8" PVC for MWS Bypass, Furnish and Install Proprietary Biofiltration (MWS-L-8-16-V), Furnish and Install Proprietary Biofiltration (MWS-L-4-6-C), Furnish and Install Dvert System (DVERT DVT-10-8), Remove and Salvage Existing Pole and Demolish Foundation, Remove Existing Luminaire, Remove Existing Pull Box, Furnish And Install (Type 15) Pole and Foundation, Furnish And Install (Type 1-B) Pole and Foundation, Furnish and Install Luminaire (LED), Furnish and Install Pedestrian Push Button (APS), Establish SDG&E Connection, Furnish and Install Dual Direction RRFB, Solar Assembly, and Controller, Furnish And Install Pull Box (All Types), Furnish And Install Conduit (2" Conduit), Remove Existing Lighting and Electrical Wiring (54th), Remove Existing Lighting and Electrical Wiring (58th), Remove Existing Lighting and Electrical Wiring (College), Remove Existing Lighting and Electrical Wiring (Chollas), Furnish and Install Street Light Wiring (54th), Furnish and Install Street Light Wiring (58th), Furnish and Install Street Light Wiring (College), Furnish and Install Street Light Wiring (Chollas), Furnish and Install Street Light Wiring (Bonillo), Remove Thermoplastic Pavement Marking, Remove Traffic Stripe and Pavement Markers, Remove Existing Painted Curb, Furnish and Install 4" Thermoplastic Traffic Stripe, Furnish and Install 12" White Thermoplastic Limit Stripe, Furnish and Install White Thermoplastic Continental Crosswalk, Furnish and Install White Lane Line Pattern (Caltrans Detail 9) with Retroreflective Pavement Marker, Furnish and Install Two-Directional No Passing Pattern (Caltrans 22) with Retroreflective Pavement Marker, Furnish and Install Left Edge Line Pattern (Caltrans 25) with Retroreflective Pavement Marker, Furnish and Install Right Edge Line Pattern (Caltrans 27B), Furnish and Install Right Edge Line Pattern (Caltrans 27C), Furnish and Install Median Island Pattern (Caltrans 29) with Retroreflective Pavement Marker, Furnish and Install Two-Way Left Turn Pattern (Caltrans 32) with Retroreflective Pavement Marker, Furnish and Install White Channelizing Line Pattern (Caltrans 38) with Retroreflective Pavement Marker, Furnish and Install Bike Lane Line Pattern (Caltrans 39), Furnish and Install Intersection Line Bike Lane Pattern (Caltrans 39A), Furnish and Install Type D Retroreflective Pavement Marker, Furnish and Install Thermoplastic White "STOP" Pavement Marking, Furnish and Install Thermoplastic "BUS ONLY" Pavement Marking, Furnish and Install Thermoplastic "BUMP" Pavement Marking, Furnish and Install Thermoplastic "PED XING" Pavement Marking (Caltrans A24D), Furnish and Install Thermoplastic White Type IV Arrow Pavement Marking (Caltrans A24A), Furnish and Install Thermoplastic White Modified Type IV Arrow Pavement Marking (Caltrans A24A), Furnish and Install Thermoplastic White Type VI Arrow Pavement Marking (Caltrans A24A), Furnish and Install Thermoplastic White Type VII (R) Arrow Pavement Marking, Furnish and Install Thermoplastic White Modified Type VII (R) Arrow Pavement Marking, Furnish and Install Thermoplastic Bike Lane With Person Pavement Marking (Caltrans A24C), Furnish and Install Thermoplastic Bike Lane Arrow Pavement Marking (A24A), Furnish and Install Thermoplastic Sharrow Pavement Marking (Caltrans A24C), Furnish and Install Thermoplastic Diamond Pavement Marking (Caltrans A24C), Furnish and Install Thermoplastic Road Lump Arrow Pavement Marking, Furnish and Install Thermoplastic Bicycle Detector Pavement Marking, Furnish and Install Pedestrian Bike Crosswalk Marking, Furnish and Install Green Bike Lane Conflict Marking, Furnish and Install 6" White Diagonal Buffer Hatching, Paint Curb (2-Coat), Paint Type A Asphalt Dike, Furnish and Install Yield Line (Caltrans A24G), Furnish and Install Yield Line for Pedestrian Bike Crosswalk, Furnish and Install White Channelizer Posts with White High Intensity Retro-Reflective Sheeting, Remove and Salvage Existing Traffic Sign and Post, Remove and Salvage Existing Traffic Sign, Relocate Existing Traffic Sign and Post, Furnish and Install Break-Away Traffic Post, Furnish and Install New Traffic Sign, Furnish and Install Pedestrian Barricade per SDG-141, Install Bus Stop Sign Post, Remove and Salvage Existing Signal Mast Arm Pole and Demolish Foundation, Remove and Salvage Existing (Type PBA or 1-A) Pole and Demolish Foundation, Remove Existing Vehicle Signal Head & Mounting, Remove Existing Pedestrian Signal Head & Mounting, Remove Existing Pedestrian Push Button, Remove Existing Luminaire, Remove and Salvage Emergency Vehicle Pre-emption (EVP) Equipment, Remove and Salvage Existing Traffic Signal Cabinet and Controller Assembly, Remove and Salvage Existing Traffic Signal Controller, Demolish Existing Traffic Signal Controller Foundation, Remove Existing Pull Box, Remove and Salvage Existing Sign on Signal Standard/Mast Arm, Relocate Existing Sign on Signal Standard/Mast Arm, Relocate Existing Traffic Signal Cabinet and Controller on New Foundation, Furnish and Install Case 3 Pole and Foundation, Furnish and Install Case 4 Pole and Foundation, Furnish and Install Case 5 Pole and Foundation, Furnish And Install (Type 15TS) Pole and Foundation, Furnish And Install (Type 1-A) Pole and Foundation, Furnish And Install Pedestrian Push Button Post and Foundation, Furnish and Install Luminaire (LED), Transit Signal Priority System Integration, Furnish and Install Bus Signal Head (1 Section), Furnish and Install Vehicle Signal Head (3 Section), Furnish and Install Vehicle Signal Head (4 Section), Furnish and Install Vehicle Signal Head (5 Section), Furnish and Install Bike Signal Head (3 Section), Furnish and Install SV-1-T Mount, Furnish and Install SV-2-T Mount, Furnish and Install SV-3-T Mount, Furnish and Install SV-4-T Mount, Furnish and Install TV-1-T Mount, Furnish and Install TV-2-T Mount, Furnish and Install TV-3-T Mount, Furnish and Install TV-4-T Mount, Furnish and Install Pedestrian Signal Head, Furnish and Install SP-1-T Mount, Furnish and Install SP-2-T Mount, Furnish and Install TP-1-T Mount, Furnish and Install Pedestrian Push Button (APS), Furnish and Install Opticom 721 EVP Detector & Discriminator Input, Furnish and Install 332 Traffic Signal Control Cabinet, Furnish and Install 332 Traffic Signal Control Cabinet Foundation, Furnish and Install 2070 Controller Assembly and  Miscellaneous Equipment, Furnish and Install Blank Out Sign (R3-1), Furnish and Install Sign on Signal Standard/Mast Arm, Furnish and Install Video Detection Camera, Furnish and Install Type E Loop Detector, Furnish and Install Type E Modified Loop Detector, Furnish and Install Type Q Bike Loop Detector, Establish SDG&E Connection, Relocate Existing Service Enclosure on New Foundation, Furnish and Install Type III Service Enclosure  and Foundation, Furnish and Install 72 Single Mode Fiber Optic System, Furnish And Install Pull Box (All Types), Furnish And Install Conduit (3" Conduit), Furnish And Install Conduit (4" Conduit), Remove Traffic Signal Conductors and Cables (Winona), Remove Traffic Signal Conductors and Cables (52nd), Remove Traffic Signal Conductors and Cables (54th), Remove Traffic Signal Conductors and Cables (58th), Remove Traffic Signal Conductors and Cables (University Square), Remove Traffic Signal Conductors and Cables (60th), Remove Traffic Signal Conductors and Cables (College), Remove Traffic Signal Conductors and Cables (Rolando), Remove Traffic Signal Conductors and Cables (Aragon), Remove Traffic Signal Conductors and Cables (Salvation), Furnish and Install Traffic Signal Wiring (Winona), Furnish and Install Traffic Signal Wiring (52nd), Furnish and Install Traffic Signal Wiring (54th), Furnish and Install Traffic Signal Wiring (58th), Furnish and Install Traffic Signal Wiring (University Square), Furnish and Install Traffic Signal Wiring (60th), Furnish and Install Traffic Signal Wiring (College), Furnish and Install Traffic Signal Wiring (Rolando), Furnish and Install Traffic Signal Wiring (Aragon), Furnish and Install Traffic Signal Wiring (Salvation), Furnish and Install Traffic Signal Wiring (Estrella), Adjust Non-Participating Manhole to Finish Grade, Adjust Non-Participating Pull Box to Finish Grade, Furnish and Install Fire Hydrant per SDPWC SDW-104, Extend Existing Copper Tubing & Furnish and Install Air/Vac per SDPCW SDW-117 and SDW-159, Extend Existing 12" Water Service Line and Install 12" Gate Valve, Relocate Water Meter, Backflow, and Valve Assembly, Mobilization / Demobilization, Time Related Overhead, Progress Schedule, Surveying and Construction Staking, Traffic Control and Stage Construction, "Erosion Control per SWPPP and NPDES General Construction Permit, including, Preparation of SWPPP, Implementation, Maintenance, Management, and Compliance", Street Sweeping, Unclassified Excavation, Unsuitable Material, Remove and Dispose Asphalt Pavement and Base, Remove and Dispose PCC Median, Curbs, Gutters, PCC Pavement, Walks and Base, Sawcut, Construct 4" PCC Sidewalk per SDPWC SDG-155, SDG-156 and SDRSD G-9, G-10, Construct PCC Retaining Curb (All Types), Construct PCC Curb and Gutter per SDPWC SDG-151 (All Types), Construct PCC Curb Ramp (All Types), Construct PCC Cross Gutter per SDPWC SDG-157, Construct Pavement Section Type A (TI=10.5, R-Value=0 to 9.9), Construct Pavement Section Type B (TI=10.5, R-Value=50), Construct 9" PCC Bus Stop Slab per SDPWC SDG-102, Cold Mill Asphalt Pavement, Place Asphalt Overlay with Reinforcing Fibers, Furnish and Install Pedestrian Barricade per SDG-141, Furnish and Install Protective Railing Per SDPWC SDG-140, Furnish and Install New Traffic Sign, Furnish and Install White Thermoplastic Continental Crosswalk, Remove Existing Pedestrian Push Button Post and Foundation, Remove Existing Pedestrian Push Button, Relocate Existing Pedestrian Push Button (APS), Furnish And Install Pedestrian Push Button Post and Foundation, Furnish and Install Pedestrian Push Button (APS), Furnish And Install Conduit (3" Conduit), Furnish and Install Traffic Signal Wiring (Add Alt), Furnish And Install Pull Box (All Types), Remove Existing Pedestrian Signal Head & Mounting, Furnish and Install Pedestrian Signal Head, Furnish and Install SP-1-T Mount, Furnish and Install SP-2-T Mount, Adjust Pull Box to Finish Grade, Trucking, Equipment Rental.

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Griffith Company
CA Contractors License #88
13400 Sabre Springs Parkway, Ste 200 | San Diego, CA, 92128
Phone: 858-727-5031 Fax: 562-864-8970

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME