www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date September 24, 2024 @ 3:00 p.m. through bid opening date

Griffith Company Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:

Contracting Agency: San Bernardino County Department of Public Works | Work Order No. H14646 / Bid No. PWG125-LANDD-5623
Project: Glen Helen Parkway Bridge Over Cajon Wash
Project Location: Devore San Bernardino CA
BID DATE/TIME: October 17, 2024 @ 10:00 AM
BID DATE/TIME: Thursday, October 31, 24 at 10:00 AM
BID DATE/TIME: Thursday, November 14, 2024 at 10:00 AM
BID DATE/TIME: Thursday, November 21, 2024 at 10:00 AM

***NEW BID DATE: Thursday, December 5, 2024 at 11:00 AM
DBE Goal: 21%

Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/3xo4gdwd7ocsemksc
m4ji/AKeby9ApX3uVnz10xScVAEw?rlkey=yvwu2tpd1dip1obwtt0xldwai&st=mmu2n4g3&dl=0

***Addendum 1-6 have been issued***

General work description:  The work, in general, consists of constructing a bridge over the Cajon Wash including a three-sided MSE retaining wall, approach embankments/roadways; constructing a maintenance access road; installing a storm drain system underneath railroad tracks with outlet structure at Cajon Wash; and constructing median modifications to the existing Glen Helen Parkway Grade Separation structure.

Griffith Company an Equal Opportunity Employer requests sub quotes from all qualified subcontractors and suppliers including certified DBE firms performing commercially useful function for the following items of work, including but not limited to: SUPPLEMENTAL WORK (FEDERAL TRAINEE PROGRAM), SUPPLEMENTAL WORK (VALUE ANALYSIS), SUPPLEMENTAL WORK (PARTNERING), SUPPLEMENTAL WORK (COMPENSATION ADJUSTMENTS - PAVING ASPHALTS), SUPPLEMENTAL WORK (DISPUTE RESOLUTION BOARD), TEMPORARY  COMBINED SBKR AND HIGH-VISIBILITY FENCE, REMOVE TREE, ROADWAY EXCAVATION (CAJON WASH), STRUCTURE EXCAVATION, OUTLET STRUCTURE (USACE), STRUCTURE BACKFILL, OUTLET STRUCTURE (USACE), PLANT (48" BOX), PLANT (24" BOX), PLANT (5 GAL), PLANT (1 GAL), TEMPORARY IRRIGATION SYSTEM, ROTATING NOZZLE (12" POP-UP), REMOVE DECOMPOSED GRANITE SURFACE, 24" CONCRETE FES (CALTRANS D94B), MINOR CONCRETE (BRIDGE MEDIAN), MINOR CONCRETE (CURB, BRIDGE MEDIAN), STRUCTURAL CONCRETE, OUTLET STRUCTURE (USACE), PTFE BEARING (APPROACH SLAB), BAR REINFORCING STEEL, OUTLET STRUCTURE (USACE), REMOVE CONCRETE, EXISTING BRIDGE MEDIAN, 54" RCP - USACE BEDDING, 54" RCP - JACK AND BORE WITH 72" STEEL CASING, WELDED STEEL RECTANGULAR CASING (BRIDGE), JUNCTION STRUCTURE (SPPWC 321-2), MANHOLE (SPPWC 320-2), ROCK SLOPE PROTECTION (BACKING NO.1, METHOD B), 6" PCC CURB ONLY, 8" PCC CURB ONLY, PCC CROSS GUTTER, CONCRETE COLLAR (SPPWC 380-4), MINOR CONCRETE (STAMPED CONCRETE, BRIDGE MEDIAN), INTERLOCKING BRICK PAVERS, REMOVE CONCRETE, TYPE "GO" INLET (CALTRANS D73B), TYPE "G1" INLET (CALTRANS D73B), 48" CMP RISER (CALTRANS D93A), "OLDCASTLE CATCH BASIN MODEL CB-484848 WITH A PERFORATED BOTTOM", OLDCASTLE MODIFIED INLET MODEL 3636-TYPE-E-INL, TYPE "OL" INLET, L=14.0' (CALTRANS D73A), MISCELLANEOUS METAL, OUTLET STRUCTURE (USACE), ADJUST TO GRADE VAULT, PICKET RAILING FENCE, DOUBLE SWING GATE, REMOVE VINYL FENCE, REMOVE FENCE (STEEL PIPE), CHAIN LINK RAILING (TYPE 7) (BRIDGE), TUBULAR HANDRAILING (BRIDGE) TRANSITION RAILING (TYPE AGT), INSTALL VALTIR SOFTSTOP SYSTEM TANGENT END TERMINAL, 8- IN BLOCK, TL-3, INSTALL VALTIR QUADGUARD ELITE M10 CRASH CUSHION, CONCRETE BARRIER (TYPE 732SW) (MOD), CONCRETE BARRIER (TYPE 732SW) (MOD 1), CONCRETE BARRIER (TYPE 732SW) (MOD 2), SIGNING AND STRIPING, "BARRIER RAIL MOUNTED LIGHTING STANDARD WITH 10,300, LUMEN (130W) LED LUMINAIRE WITH 10-FOOT MAST ARM, BRIDGE", BARRIER RAIL MOUNTED LIGHTING STANDARD WITH 10,300, LUMEN (130W) LED LUMINAIRE WITH 10-FOOT MAST ARM, ROADWAY, LIGHTING STANDARD WITH 10,300 LUMEN (130W) LED LUMINAIRE WITH 10-FOOT MAST ARM, FURNISH & INSTALL NEW #3 1/2 F PULL BOX, FURNISH & INSTALL NEW #3 1/2 F PULL BOX FOR TYPE 732S, BARRIER MOUNTED LIGHT, BRIDGE, FURNISH & INSTALL NEW #3 1/2 F PULL BOX FOR TYPE 732SW BARRIER MOUNTED LIGHT, ROADWAY, SERVICE CABINET, FURNISH & INSTALL NEW 2#8 INSULATED CONDUCTORS IN NEW CONDUIT, BRIDGE, FURNISH & INSTALL NEW 2#8 INSULATED CONDUCTORS IN NEW CONDUIT, ROADWAY, FURNISH & INSTALL SERVICE CONDUIT PER SCE REQUIREMENTS, TRUCKING, EQUIPMENT RENTAL.

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Griffith Company
CA Contractors License #88
12200 Bloomfield Ave. Santa Fe Springs, Ca. 90670
Phone: 562-929-1128 Fax: 562-864-8970

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME