Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: Caltrans No. 05-1K4504
Project: Construction on State Highway In Santa Barbara County Near Buellton From Old Coast Highway To 0.4 Mile South Of Santa Rosa Road Overcrossing
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=05-1K4504
DBE Goal: 21%
Bid Date: November 13, 2024, at 2:00 PM
Quotes Due by 1:00 PM 11/13/24
Engineers Estimate: $15,900,000
General work description: Cold plane and RHMA/HMA roadway and bridge & replace culverts.
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Flashing Arrow Sign, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier System, Temporary Shuttle Service, Portable Changeable Message Sign (Ea), Portable Changeable Message Sign (Ls), Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Large Sediment Barrier, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Temporary Creek Diversion Systems, Treated Wood Waste, Temporary High-Visibility Fence, Roadway Excavation, Roadway Excavation (Topsoil), Shoulder Backing, Roadside Clearing, Packet Fertilizer, Plant Tube, Plant (Group H), Plant (Group H) (Brush Layering), Temporary Irrigation System, Move-In/Move-Out (Erosion Control), Dry Seed (Sqft), Rolled Erosion Control Product (Netting), Fiber Rolls, Hydroseed, Compost (Cy), Incorporate Materials, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded Statistical Pay Factor), Hot Mix Asphalt (Bridge), Data Core, Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type D), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Aggregate Base (Approach Slab), Structural Concrete, Approach Slab (Type R), (F) - Structural Concrete, Headwall, (F) - Structural Concrete, Drainage Inlet, Drill And Bond Dowel, Clean Expansion Joint, Joint Seal (Mr 1/2"), Joint Seal (Mr 1"), Joint Seal (Asphaltic Plug), Bar Reinforcing Steel (Headwall), Rapid Setting Concrete (Patch), Repair Spalled Surface Area, Remove Asphalt Concrete Surfacing, Remove Unsound Concrete, Polyester Concrete Expansion Dam, Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, (F) - Place Polyester Concrete Overlay, (F) - Treat Bridge Deck, Furnish Bridge Deck Treatment Material, Bridge Removal (Portion), 24" Reinforced Concrete Pipe, 36" Reinforced Concrete Pipe, 72" Corrugated Steel Pipe (.138" Thick), 24" Concrete Flared End Section, 36" Reinforced Concrete Pipe Riser, Remove Culvert (Lf), Remove Riser, Remove Headwall, Cleaning, Inspecting, And Preparing Culvert (Lf), Concrete Invert Paving, 72" Cured-In-Place Pipeliner (Lf), Rock Slope Protection Void Filler, Concrete (Slope Protection), Gravel Filter, Rock Slope Protection (3T, Class X, Method A), Rock Slope Protection (300 Lb, Class Iv, Method B) (Ton), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Minor Concrete (Miscellaneous Construction), (F) - Miscellaneous Iron And Steel, Temporary Fence, Remove Pavement Marker, Delineator (Class 1), Guard Railing Delineator, Pavement Marker (Retroreflective), Milepost Marker, Marker (Culvert), Object Marker (Type K), Object Marker (Type L), Object Marker (Type P), Object Marker (Type L-1), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Roadside Sign - One Post, Install Roadside Sign Panel On Existing Post, Midwest Guardrail System (Steel Post), Midwest Guardrail System (8' Steel Post), Vegetation Control (Crushed Shale), Transition Railing (Type Agt), End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Concrete Barrier (Type 60Ms), (F) - Concrete Barrier Transition, Remove Guardrail, Remove Concrete Barrier, Remove Concrete Barrier Transition, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, 12" Rumble Strip (Asphalt Concrete Pavement), 6" Traffic Stripe Tape (Warranty) (Broken, 36-12), 6" Traffic Stripe Tape With Contrast (Warranty), 6" Traffic Stripe Tape With Contrast (Warranty) (Broken 36-12), Mobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.
Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |