www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date October 7th, 2024 @ 3:35 p.m. through bid opening date

Griffith Company Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency: Kern County Public Works Dept. Project No. 25015
Project: Pedestrian Path Improvements on Buena Vista Boulevard from May Street to Mobile Home Park East of Main Street
Bid Date: October 23, 2024, at 11:00 AM
DBE Goal: 22%
Estimate: $1,050,000.00
Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/8mudjsnhnvucw54z1lqa4/ADkYrW_CuMKU9fKg0IlbfuY?rlkey=5y1i7lrbr42q6og4r0dsphlmu&st=dkvf8dgy&dl=0

***Please Note that We will need all UEI Numbers for Subcontractors listed at time of bid***

The work to be performed consists, in general, of the construction of multi-use paths, sidewalks, curbs, gutters, curb ramps, drive approaches, paving hot mix asphalt , applying thermoplastic pavement markings, reconstructing fences, installing signs and of flashing beacons, and sump regrading

Scope of Work: Lead Compliance Plan, Develop Water Supply, Temporary Traffic Control, Prepare Storm Water Pollution Prevention Plan, Remove Concrete, Remove and Salvage Bus Stop Shelter, Clearing and Grubbing, Roadway Excavation, Sump Excavation, Repair Existing Landscaping, Finishing Roadway, Class 2 Aggregate Base, Hot Mix Asphalt Concrete, Place Hot Mix Asphalt (Miscellaneous Area), Cold Plane Asphalt Concrete Pavement, Rock Slope Protection (150lb, Class III, Method B), Minor Concrete (Curb), Minor Concrete (Curb and Gutter), Minor Concrete (Drive Approach), Minor Concrete (Sidewalk), Minor Concrete (Type C Drive Approach), Minor Concrete (Cross Drain), Minor Concrete (Walkway), Minor Concrete (Curb Ramp), Relocate Mailbox, Reconstruct Wrought Iron Fence, Reconstruct Chain Link Fence, Relocate Roadside Sign-One Post, Roadside Sign One-Post, Reconstruct Guardrail, Thermoplastic Pavement Marking, Flashing Beacon System, Mobilization

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Griffith Company
CA Contractors License #88
1128 Carrier Parkway Avenue Bakersfield, CA 93308
Phone: 661-392-6640 Fax: 661-393-9525

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME