www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date October 11, 2024 @ 2:40 p.m. through bid opening date


Griffith Company Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:

Contracting Agency: Caltrans – Project No. 11-056404
Project: Construction on State Highway In San Diego County Near San Diego From 0.2 Mile West Of Sanyo Avenue Undercrossing To 0.2 Mile East Of Siempre Viva Road Overcrossing  
Scope of Services: Perform grading, construct drainage facilities, signs and striping.
Bids open November 14, 2024 at 2:00 PM
Estimate: $29,000,000
DBE Goal:
22%

Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/z2wwarqi8amr5pulr5otq/AFz_-QE1hj2sliLRJA0TQS4?rlkey=uspv11ltgo277hxpu2qqesfkf&st=nj1smitn&dl=0

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Develop Water Supply, Construction Area Signs, Traffic Control System, Remove Barricade Type Iii, Channelizer (Surface Mounted) (Left In Place), Remove Channelizer (Surface Mounted), Portable Changeable Message Sign (Ea), Temporary Crash Cushion Tl-3, Job Site Management, Stormwater Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Manage Solid Waste Generated By The Public (Initial Cleanup), Manage Solid Waste Generated By The Public, Treated Wood Waste, Clearing And Grubbing (Acre), Dust Palliative, Roadway Excavation, Ditch Excavation, Imported Borrow (Cy), Asphaltic Emulsion (Fog Seal Coat), Rubberized Hot Mix Asphalt (Gap Graded), Tack Coat, Cold Plane Asphalt Concrete Pavement, (F) - Structural Concrete, Box Culvert, (F) - Structural Concrete, Headwall, Install Precast Box Culvert (8'X4'), Structural Concrete, Junction Structure, Drill And Bond Dowel, (F) - Bar Reinforcing Steel (Box Culvert), 24" Reinforced Concrete Pipe, 72" Reinforced Concrete Pipe, Install 72" Reinforced Concrete Pipe, 4" Plastic Pipe Underdrain, 36" Reinforced Concrete Pipe Riser, Remove Drainage Facility (Ea), Adjust Frame And Cover To Grade, Concrete (Channel Lining), Concrete (Concrete Apron), Rock Slope Protection (150 Lb, Class Iii, Method B) (Cy), Relocate Rock Slope Protection (Concreted, Method B), Concreted-Rock Slope Protection (1/2 T, Class Vii, Method B) (Cy), Concreted-Rock Slope Protection (1/4 T, Class V, Method B) (Cy), Rock Slope Protection Fabric (Class 8), (F) - Miscellaneous Iron And Steel, Delineator (Class 1), Pavement Marker (Retroreflective), Remove Roadside Sign, Remove Roadside Sign (Strap And Saddle Bracket Method), Relocate Roadside Sign, Furnish Laminated Panel Sign (1"-Type A), Furnish Laminated Panel Sign (1"-Type B), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Sign (Mast-Arm Hanger Method), Install Roadside Sign Panel On Existing Post, (F) - Cable Railing, Relocate Concrete Barrier (Type K), Remove Concrete Barrier (Type K), Remove Crash Cushion, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), Preformed Thermoplastic Pavement Marking, 6" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility) (Broken 6- 1), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken, 17-7), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 8- 4), 8" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Pavement Marking, 8" Traffic Stripe Tape With Contrast (Warranty) (Broken 12-3), Contrast Stripe Paint (2-Coat), Remove Traffic Stripe, 6" Traffic Stripe Tape (Warranty) (Broken, 17-7), 6" Traffic Stripe Tape With Contrast (Warranty) (Broken 36-12), 8" Traffic Stripe Tape With Contrast (Warranty), Mobilization, Trucking, Equipment Rental

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Griffith Company
CA Contractors License #88
13400 Sabre Springs Parkway, Ste 200 | San Diego, CA, 92128
Phone: 858-727-5031 Fax: 562-864-8970

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME