Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: City of Arroyo Grande
Project: Replacement of AG Creek Bridge at Traffic Way | Bid Number: PW 2023-02
Plans & Specs: https://www.arroyogrande.org/bids.aspx?bidID=159
DBE Goal: 22%
Bid Date: October 24, 2024 at 2:00 PM
Please submit all bids by 1:00 PM on 10/24/2024
Engineers Estimate $11,600,000
General work description: In general, the project consists of replacing the existing Arroyo Grande Creek Bridge at Traffic Way by replacing the existing Cast-In-Place Reinforced Concrete Tee-Beam bridge with a 3-span post-tensioned concrete box girder bridge. Project elements include HMA paving, rock slope protection, sidewalks, driveways, drainage, and stormwater treatment.
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Furnish Field Office, Construction Staking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Type Iii Barricade, Temporary Traffic Stripe -Tape, Temporary Pavement Marking-Tape, Portable Changeable Message Sign, Temporary Railing (Type K), Job Site Management, Prepare Storm Water Pollution Prevention Plan , Storm Water Sampling And Analysis Day Storm Water Annual Report, Temporary Check Dam, Temporary Fiber Roll, Temporary Construction Entrance, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Water Quality Annual Report, Temporary Creek Diversion Systems, Fish Protection, Invasive Species Control, Bat And Bird Exclusion, Temporary High-Visibility Fence, Clearing And Grubbing, Remove Tree, Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Structure Excavation (Bridge), Structure Backfill (Bridge), 4" Conduit, Hydroseed, Class 2 Aggregate Base, Temporary Class 2, Aggregate Base, Slurry Seal, Hot Mix Asphalt (Type A), Cold Plane Asphalt, Concrete Pavement, Temporary Shoring , 48" Cast-In-Drilled-Hole Concrete Piling, Prestressing Cast-In-place Concrete, Structural Concrete, Bridge Footing C, Structural Concrete, Bridge , Structural Concrete Bridge (Polymer Fiber) , Structural Concrete Headwall, Structural Concrete, Drainage Inlet Cy 1.3, Joint Seal Assembly (Mr 2 1/2"), Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel(Retaining Wall) Bridge Removal, 12" Reinforced Concrete Pipe, 18" Reinforced Concrete Pipe , 54" Reinforced Concrete Pipe, 18" Corrugated Steel Pipe(.064" Thick), 8" Plastic Pipe Underdrain, 8" Perforated Plastic Pipe Underdrain, Class 2 Permeable Material, Cleanout, 24" Welded Steel Pipe Casing (Bridge), 36" Precast Concrete Pipe Inlet , Storm Drain Manhole, Remove Pipe (Lf), Remove Headwall, Reset Inlet E , Adjust Inlet, Culvert Slurry-Cement, Backfill, Rock Slope Protection (300Lb, Class Iv, Method B) , Rock Slope Protection Fabric (Class 8) , Temporary Rock Slope, Protection Fabric (Class 8), Minor Concrete (Gutter) , Minor Concrete (Curb And Gutter) , Minor Concrete (Sidewalk) , Remove Curb, Remove Concrete Sidewalk, Remove Concrete (Curb, Gutter, And Sidewalk), Miscellaneous Iron And Steel, Inlet Frame And Grate, Miscellaneous Metal(Bridge), Potable Water Main And Appurtenances, Paint Curb (2-Coat), Construction Access, Temporary Razor Wire, Fence, Metal Fence, Salvage Gate, Temporary Delineator(Class 1), Remove Roadside Sign (Metal Post), Reset Roadside Sign, Relocate Roadside Sign one Post, Lower Tubular, Handrailing, Pedestrian Railing, Cable Railing, Concrete Barrier (Type 85Sw), Remove Railing Ladder And Appurtenances, Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Lighting (City Street) , Modifying Signal And Lighting (City), Temporary Signal Systems , Temporary Signal Systems(City), Salvage Lighting Systems, Mobilization/Demobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.
Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |