Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: Caltrans No. 05-1K6404
Project: Construction on State Highway In Monterey And Santa Cruz Counties At Various Locations From Trafton Road Undercrossing To 0.2 Mile North Of Larkin Valley Road.
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/planholders/getph.php?c=05-1K6404&b=n
DBE Goal: 21%
Bid Date: December 4, 2024, at 2:00 PM
Please submit all bids by 1:00 PM on 11/14/2024
Engineers Estimate $3,110,000
General work description: Widening MVP, install culverts and modifying lighting systems.
***Addendums 1-2 have been issued***
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Time-Related Overhead (Wday), Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Channelizer (Surface Mounted), Temporary Barrier System, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Water Pollution Control Program, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Concrete Washout, Treated Wood Waste, Remove Concrete (Cy), Remove Concrete (Miscellaneous) (Sqft), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Roadside Clearing, Move-In/Move-Out (Erosion Control), Hydromulch, Fiber Rolls, Hydroseed, Class 2 Aggregate Base (Cy), Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type E), Tack Coat, Remove Asphalt Concrete Dike, (F) - Structural Concrete, Headwall, (F) - Concrete Backfill (Pipe Trench), 18" Reinforced Concrete Pipe (Class Iii, Rubber Gasket Joint), 24" Reinforced Concrete Pipe (Class Iii, Rubber Gasket Joint), 24" Steel Flared End Section, Remove Headwall, Remove Flared End Section (Ea), Cleaning, Inspecting, And Preparing Culvert (Lf), Culvert Slurry-Cement Backfill, 24" Cured-In-Place Pipeliner, Concrete (Ditch Lining), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Curb) (Cy), Minor Concrete (Exposed Aggregate Concrete), Remove Concrete (Curb And Gutter), Pavement Marker (Retroreflective), Marker (Culvert), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Reconstruct Guardrail, 6" Thermoplastic Traffic Stripe, (Enhanced Wet Night Visibility) (Broken 17-7), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken, 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 12" Rumble Strip (Asphalt Concrete Pavement), Traffic Monitoring Station System, Modifying Lighting Systems, Modifying Traffic Monitoring Stations, Mobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.
Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |