www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date October 21, 2024 @ 3:20 p.m. through bid opening date

An Equal Opportunity Employer

Specialty Construction, Inc. Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Agency:  City of Arroyo Grande | 2024-02
Project: Cornwall Avenue Watermain Replacement Project
Bid Date: November 5, 2024, at 2:00 PM

Plans and Specs are available at the following link: 24-033 - Cornwall Ave Watermain Replacement, Arroyo Grande

General work description:  In general, the project consists of installing approximately 1350 LF of 8-inch diameter potable waterline in the public right-of-way including replacement of water services and appurtenances and abandonment of the existing waterline.

Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Sheeting, Shoring, Bracing, And Excavation Safety Measures, Traffic Control, 8" Pvc, 235, C900 Dr-18, Hot Tap Existing 8" C900 Watermain On North Rena Street At Sta 0+00, Alpine Street Connection At Sta 3+57, Bell Street Connection At Sta 7+29, Oak Street Connection At Sta 10+57 And 10+76, 8" Pvc Watermain Tie Over On Cornwall At Sta 12+00, Tyler Union Gos Water Valve Box And Lid, 1" Water Service, 1" Water Service & Reconnection In Street Per N2 On Sheet 5, Sidewalk Replacement & Concrete Pad Around Meter, Cross Gutter Repair, Tree/Bush Removal, Furnish And Install New Fire Hydrant Assembly, 6" Pvc, 235, C900 Dr-18, Red Paint Curb, Blue Reflectors, Disinfection And Pressure Testing Of Piping, Pavement Trench Repair, Pavement Striping, Remove And Salvage Fire Hydrant Assembly, Removal Of Abandoned Meter Boxes & Backfill With Class 3 Aggregate, Abandonment, Cap And Demolition Of Existing Watermain, Water Services And Valves Per D1 & D2 On Sheet 5, Storm Water Control Plan

Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested DBE/MBE/WBE/SBE/SBRA/LSAF/HUB/MBE/WBE/SBE/SBRA/LSAF/HUB firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price. SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate. For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents

Specialty Construction, Inc.     
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722

Contacts:
Tom Seidel: tseidel@specialtyconstruction.com
Sheri Shamblin: Shamblin@specialtyconstruction.com

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME