Papich Construction Company Is requesting quotations from all qualified DBE Sub-contractors and Material suppliers for the following project:
Agency: Caltrans No. 05-1K5104
Project: Construction on State Highway In Santa Barbara County At And Near Los Alamos And Orcutt At Various Locations From 2.3 Miles North Of Route 154/101 Separation To 0.6 Mile North Of Union Valley Parkway Overcrossing
Plans & Specs: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=05-1K5104
DBE Goal: 22%
Bid Date: December 5, 2024, at 2:00 PM
Quotes Due by 1:00 PM 12/05/24
General work description: Drainage systems, lighting systems and replace TMS Elements.
Estimating Dept.
Email: estimating@papichconstruction.com
Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead (Wday), Dispute Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Develop Water Supply, Construction Area Signs, Traffic Control System, Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Barrier System, Portable Changeable Message Sign (Ls), Mobile Barrier System, Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Water Pollution Control Program, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Large Sediment Barrier, Temporary Concrete Washout, Temporary Fence Wildlife Exclusion, Bat And Bird Exclusion Devices, Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Channel Excavation, Ditch Excavation, Imported Borrow (Cy), Roadside Clearing, Plant (Group H), Plant Establishment Work, Temporary Irrigation System, Rolled Erosion Control Product (Netting), Fiber Rolls, Hydroseed, Compost (Cy), Incorporate Materials, Hot Mix Asphalt (Type A), Minor Hot Mix Asphalt, Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, (F) - Structural Concrete, Headwall, (F) - Minor Concrete (Minor Structure), Drill And Bond Dowel, Repair Spalled Surface Area, Remove Unsound Concrete, Furnish Polyester Concrete Overlay, (F) - Place Polyester Concrete Overlay, 36" Alternative Pipe Culvert, (F) - Concrete Backfill (Pipe Trench), 24" Reinforced Concrete Pipe, 36" Reinforced Concrete Pipe, 42" Reinforced Concrete Pipe, 24" Corrugated Steel Pipe (.079" Thick), 36" Corrugated Steel Pipe (.064" Thick), 24" Steel Flared End Section, 36" Steel Flared End Section, Abandon Culvert (Lf), Remove Drainage Facility (Ea), Remove Culvert (Lf), Remove Inlet, Remove Headwall, Grout Annular Space, Concrete Invert Paving, Sand Backfill, Remove Box Culvert (Portion), Rock Slope Protection Void Filler, Concrete (Ditch Lining), Concrete (Channel Lining), Concrete (Concrete Apron), Gravel Filter, Rock Slope Protection (300 Lb, Class Iv, Method B) (Cy), Rock Slope Protection (150 Lb, Class Iii, Method B) (Cy), Rock Slope Protection (20 Lb, Class I, Method B) (Cy), (F) - Miscellaneous Iron And Steel, Fence (Type Wm, Metal Post), 12' Wire Mesh Gate, Remove Pavement Marker, Pavement Marker (Retroreflective), Marker (Culvert), Reset Marker, 6" Thermoplastic Traffic Stripe, Remove Thermoplastic Traffic Stripe, 12" Rumble Strip (Asphalt Concrete Pavement), Maintaining Existing Traffic Management System Elements During Construction, Lighting System, Modifying Lighting Systems, Modifying Traffic Monitoring Stations, Mobilization
Requirements: At the time of the bid, all subcontractors must possess a valid and relevant California Contractors License, a valid DIR registration number, meet the project’s minimum insurance requirements, and be 100% bondable. All subcontractor, supplier, and trucking proposals must be in strict accordance with the project plans, specifications, and any addenda issued. In addition, all Supplier and Subcontractors will be required to execute Papich’s standard subcontract or purchase order agreement (available upon request). Waiver of Subrogation will be required. Papich is a signatory contractor and will require a one-time job agreement for any non-union Subcontractors. Submission of a proposal shall constitute subcontractor, supplier, or trucker acceptance of all terms as listed above. Any attempted deviation or revision to said terms shall not be recognized by Papich. Papich can offer DBE firms assistance with bidding this contract including but not limited to: reducing items of work into smaller scopes, providing reimbursement for payment/performance bond premiums, and providing assistance obtaining materials. All requests for assistance must be made prior to the project bid date. Additionally, DBE firms must possess a valid and current certification to be considered for this contract. Questions concerning above requirements should be directed to our office prior to submission of a proposal.
Heavy Civil | Oil & Gas | Power | Site Development | Transportation
398 Sunrise Terrace | Arroyo Grande, CA 93420
Phone: 805-473-3016 Fax: 805-481-5966 |