www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date November 13, 2024 @ 2:26 p.m. through bid opening date

Good afternoon,
Griffith Company will be bidding on Caltrans No. 07-370404 - Cold plane AC pavement, place hot mix asphalt and install MGS in Los Angeles County. Please take a look at the following project information and let us know if you’re interested in providing a quote for any of the material supplies or work on this project.  If you have any questions or need additional information, please reply to this email, or contact the Estimator: Scott Miles Smiles@griffithcompany.net
Thank You.

Griffith Company Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Contracting Agency: Caltrans No. 07-370404
Project: Construction on State Highway In Los Angeles County From Lake Hughes Road Undercrossing To 0.7 Mile South Of Vista Del Lago Road Overcrossing.
Bid Date: Wednesday, December 11, 2024, at 2:00 PM
DBE Goal: 22%
Engineers Estimate: $58,000,000
Plans & Specs can be viewed for free online at: https://www.dropbox.com/scl/fo/6g9mtpg4yeuit6vuugkr0/AFfHDyDJp5W9wtOn9GDaFyA?rlkey=059y4fqsdq0a63a43hff92v5o&st=nlt3om5s&dl=0

General work description:  Cold plane AC pavement, place hot mix asphalt and install MGS.

Scope of Work:   Lead Compliance Plan, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Construction Area Signs, Traffic Control System, Channelizer (Surface Mounted), Temporary Barrier System, Temporary Crash Cushion Tl-3, Job Site Management, Stormwater Pollution Prevention Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Remove Yellow Thermoplastic Pavement Marking (Hazardous Waste), Treated Wood Waste, Roadway Excavation, Roadway Excavation (Type Z-2) (Aerially Deposited Lead), Move-In/Move-Out (Erosion Control), Bonded Fiber Matrix (Sqft), Permanent Erosion Control Establishment Work, Class 3 Aggregate Base (Cy), Lean Concrete Base Rapid Setting, Base Bond Breaker, Replace Asphalt Concrete Surfacing, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type D), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete Pavement (Rsc), Jointed Plain Concrete Pavement (Rsc) Random, Drill And Bond (Dowel Bar), (F) - Structural Concrete, Drainage Inlet, Dpp Infiltration Area (Rock Infill), 24" Reinforced Concrete Pipe, 18" Corrugated Steel Pipe (.064" Thick), 24" Corrugated Steel Pipe (.064" Thick), Abandon Inlet, Abandon Pipeline, Remove Overside Drain, Remove Pipe (Lf), Remove Inlet, Concrete (Ditch Lining), Cellular Confinement System (Sqft), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), (F) - Miscellaneous Iron And Steel, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective- Recessed), Treatment Best Management Practice Marker, Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Roadside Sign - One Post, Midwest Guardrail System (8' Steel Post), Vegetation Control (Minor Concrete), Transition Railing (Type Agt), End Cap (Type A), End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal System, Alternative Flared Terminal System, Concrete Barrier (Type 60Sd), (F) - Concrete Barrier Transition, Remove Guardrail, Remove Concrete Barrier, Preformed Thermoplastic Pavement Marking, Paint Traffic Stripe (2-Coat), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 12" Rumble Strip (Asphalt Concrete Pavement), 12" Traffic Stripe Tape (Warranty)(Recessed), Contrast Stripe Paint (2-Coat), 6" Traffic Stripe Tape (Warranty)(Recessed) (Broken 17-7), 6" Traffic Stripe Tape (Warranty)(Recessed) (Broken 36-12), 6" Traffic Stripe Tape (Warranty)(Recessed), Maintaining Existing Traffic Management System Elements During Construction, Traffic Monitoring Station System, Camera Systems, Modifying Lighting Systems, Modifying Traffic Monitoring Stations, Mobilization

Requirements: Griffith Company is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons, and Carpenters Unions. 100% performance and payment bonds required for the full amount of the subcontract price. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation insurance coverage meeting Griffith’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the Estimator. Please call if you need assistance in obtaining bonding, insurance, equipment, materials, and/or supplies. Griffith Company intends to work cooperatively with all qualified firms seeking work on this project. Griffith Company is an Equal Opportunity Employer. Griffith Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages.

Griffith Company
CA Contractors License #88
1128 Carrier Parkway Avenue Bakersfield, CA 93308
Phone: 661-392-6640 Fax: 661-393-9525

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME