www.Contractors Estimate.com
Certified DGS Trade and Focus Publication since 2002


CE Trade - Trade Paper
 
Online DVBE certification is here!
ARTICLES
&
EDITORIALS

RESOURCES
&
LINKS

City of San Diego SLBE - ELBE Program

SBE/DVBE Search

Minority Business Development Agency

Advertisement date December 24, 2024 @ 10:30 a.m. through bid opening date

An Equal Opportunity Employer

Specialty Construction, Inc. Requests Sub-bids from All Qualified & Certified DBE Subcontractors/Suppliers for:
Agency: Shafter-Waco Irrigation District
Project: Southeast Recharge Pipeline | Specifications No. SWID 24-01
Project Location: Kern County, in the vicinity of Shafter, California
Bids open Friday, January 3, 2025, at 2:00 PM.

Plans and Specs are available at the following link: 25-004 SE Recharge Basin & Pipeline, Shafter-Waco Irrigation Dist

Quotes for Services and Supplies requested for the following items for bid including, but not limited to:  Demobilization, Develop And Provide Water Supply, Environmental Compliance And Permitting, Prepare, Maintain And Restore Access Routes, Remove And Dispose Of Existing 15” A.C. Pipeline, Remove And Dispose Of Existing 24” Tee, Steel Fittings, Valve, And Concrete, Furnish And Install 24”X18”X24” Fabricated Stainless Steel Tee Connection, Furnish And Install 18” Mueller/Pratt Groundhog Valve Assembly (District Will Supply The Valves), Install 18” Cl125 (Dr-32.5) C900 Pvc Pipe (District Will Supply Straight Pipe Sections), Furnish And Install 18” Cl125 Pvc 45° Elbow, Furnish And Install 18”X18”X18” Ductile Iron Mechanical Joint Tee Connection, Connect To Existing 24” Pipeline With Romac 501 Coupler, Connect To Existing 15” Pipeline With Romac 501 Coupler, Furnish And Install 3” Underground Offset Air Vent Assembly, Furnish And Install 4” Gate Valve, Risers, Flow Meter, Air Vent, And Other Appurtenances As A Turnout Into Landowner Concrete Pipeline, Furnish And Install Mccrometer 18” Ultra Mag Flow Meter Assembly, Furnish And Install 18” Butterfly Valve Assembly, Furnish And Install Flowmeter Readout, Battery Backup With Solar Charger, Underground Conduit, And Wiring, Furnish And Install Flow Meter Access Vault, Furnish And Install Pond Inlet Bowl Assembly, SWPPP

Specialty Construction is willing to break down quotes into comparable packages as reasonably necessary. SCI will work with interested DBE/MBE/WBE/SBE/SBRA/LSAF/HUB/MBE/WBE/SBE/SBRA/LSAF/HUB firms to identify opportunities to break down items into economically feasible packages. Subcontractor/Supplier Requirements: In most cases subcontracts in excess of $50,000 may require 100% performance and payment bonds for the full amount of subcontract price. SCI will pay for bond premiums up to 2%. Subcontractors must be registered with the Department of Industrial Regulations (DIR), possess a current contractor’s license, insurance and worker’s compensation coverage meeting SCI and Owner’s requirements. Subcontractors will also be required to sign the standard SCI Subcontract Agreement or Purchase Order as appropriate. For copies of the insurance requirements, Subcontract Agreement or Purchase Order, please contact Sheri Shamblin. Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work, however, contract time availability is dictated by the Contract Documents

Specialty Construction, Inc.     
License No. 619361
645 Clarion Ct., San Luis Obispo, CA 93401
Phone: 805-543-1706 Fax: 805-543-1722

Contacts:
Tom Seidel: tseidel@specialtyconstruction.com
Sheri Shamblin: Shamblin@specialtyconstruction.com

Published by Contractor’s Estimate, Inc.
Located at http://www.contractorsestimate.com

This advertisement will run through the bid date.

 
NEWS
&
EVENTS

FEDERAL BIDDING OPPORTUNITIES

Caltrans Currently Advertised Projects

SAM SYSTEM FOR AWARD MANAGEMENT

SMBE/SWBE Query

Elite SDVOB Network

 

 
What are we about? Contact us HOME