ContractorsEstimate.Com |
|
|
Caltrans # |
12-0408C4 |
|
Bid Date |
September 27, 2001 |
|
Job Name |
12-Ora-22-R3.1/R4.0 |
|
Agency Estimate |
$2,235,000.00 |
|
|
|
Addenda Noted |
|
|
|
|
|
|
|
|
Aggressive Bid |
|
Cautious Bid |
|
1 |
EXTEND IRRIGATION CROSSOVER |
30 |
M |
$227.50 |
$6,825.00 |
|
$267.50 |
$8,025.00 |
2 |
PREPARE STORM WATER POLLUTION
PREVENTION PLAN |
1 |
LS |
$2,000.00 |
$2,000.00 |
|
$4,000.00 |
$4,000.00 |
3 |
WATER
POLLUTION CONTROL |
1 |
LS |
$5,000.00 |
$5,000.00 |
|
$8,000.00 |
$8,000.00 |
4 |
CONSTRUCTION
AREA SIGNS |
1 |
LS |
$8,000.00 |
$8,000.00 |
|
$11,000.00 |
$11,000.00 |
5 |
TRAFFIC
CONTROL SYSTEM |
1 |
LS |
$15,000.00 |
$15,000.00 |
|
$19,000.00 |
$19,000.00 |
6 |
PORTABLE CHANGEABLE MESSAGE SIGN |
1 |
LS |
$15,000.00 |
$15,000.00 |
|
$18,000.00 |
$18,000.00 |
7 |
TEMPORARY RAILING (TYPE K) |
910 |
M |
$45.00 |
$40,950.00 |
|
$62.00 |
$56,420.00 |
8 |
TEMPORARY CRASH CUSHION MODULE |
11 |
EA |
$220.00 |
$2,420.00 |
|
$250.00 |
$2,750.00 |
9 |
TEMPORARY
TRAFFIC SCREEN |
910 |
M |
$8.52 |
$7,753.20 |
|
$12.20 |
$11,102.00 |
10 |
REMOVE ASPHALT CONCRETE DIKE |
40 |
M |
$9.00 |
$360.00 |
|
$10.00 |
$400.00 |
11 |
REMOVE
HEADWALL |
3 |
EA |
$550.00 |
$1,650.00 |
|
$725.00 |
$2,175.00 |
12 |
REMOVE CONCRETE (CHANNEL) |
230 |
M3 |
$50.00 |
$11,500.00 |
|
$62.00 |
$14,260.00 |
13 |
CLEARING
AND GRUBBING |
1 |
LS |
$28,000.00 |
$28,000.00 |
|
$39,000.00 |
$39,000.00 |
14 |
ROADWAY EXCAVATION (TYPE Y)
(AERIALLY DEPOSITED LEAD) |
190 |
M3 |
$40.00 |
$7,600.00 |
|
$50.00 |
$9,500.00 |
15 |
LEAD
COMPLIANCE PLAN |
1 |
LS |
$7,000.00 |
$7,000.00 |
|
$10,000.00 |
$10,000.00 |
16 |
DITCH
EXCAVATION |
370 |
M3 |
$26.00 |
$9,620.00 |
|
$35.00 |
$12,950.00 |
17 |
IMPORTED
BORROW |
3430 |
M3 |
$12.00 |
$41,160.00 |
|
$14.00 |
$48,020.00 |
18 |
HIGHWAY
PLANTING |
1 |
LS |
$12,000.00 |
$12,000.00 |
|
$14,000.00 |
$14,000.00 |
19 |
FIBER (EROSION CONTROL) |
1080 |
KG |
$0.92 |
$993.60 |
|
$1.00 |
$1,080.00 |
20 |
SEED (EROSION CONTROL) |
4.3 |
KG |
$350.00 |
$1,505.00 |
|
$450.00 |
$1,935.00 |
21 |
COMMERCIAL FERTILIZER (EROSION
CONTROL) |
108 |
KG |
$5.00 |
$540.00 |
|
$6.00 |
$648.00 |
22 |
STABILIZING EMULSION (EROSION
CONTROL) |
81 |
KG |
$6.50 |
$526.50 |
|
$8.50 |
$688.50 |
23 |
STRAW (EROSION CONTROL) |
2.16 |
TONN |
$600.00 |
$1,296.00 |
|
$800.00 |
$1,728.00 |
24 |
MAINTAIN
EXISTING PLANTS |
1 |
LS |
$6,000.00 |
$6,000.00 |
|
$9,000.00 |
$9,000.00 |
25 |
PLANT
ESTABLISHMENT WORK |
1 |
LS |
$2,300.00 |
$2,300.00 |
|
>LS
$25,000.00 |
$25,000.00 |
|
$32,000.00 |
$32,000.00 |
27 |
ASPHALT CONCRETE (TYPE B) |
240 |
TONN |
$58.00 |
$13,920.00 |
|
$68.00 |
$16,320.00 |
28 |
PLACE ASPHALT CONCRETE
(MISCELLANEOUS AREA) |
1310 |
M2 |
$12.00 |
$15,720.00 |
|
$18.00 |
$23,580.00 |
29 |
350 MM CAST-IN-DRILLED-HOLE
CONCRETE PILING (BARRIER) |
130 |
M |
$117.50 |
$15,275.00 |
|
$122.50 |
$15,925.00 |
30 |
400 MM CAST-IN-DRILLED-HOLE
CONCRETE PILING (BARRIER) |
3800 |
M |
$101.00 |
$383,800.00 |
|
$132.00 |
$501,600.00 |
31 |
STRUCTURAL
CONCRETE |
13 |
M3 |
$750.00 |
$9,750.00 |
|
$1,000.00 |
$13,000.00 |
32 |
MINOR CONCRETE (MINOR STRUCTURE) |
32 |
M3 |
$585.00 |
$18,720.00 |
|
$750.00 |
$24,000.00 |
33 |
SOUND WALL (BARRIER) (MASONRY
BLOCK) |
3503 |
M2 |
$106.50 |
$373,069.50 |
|
$122.00 |
$427,366.00 |
34 |
SOUND WALL (MASONRY BLOCK) |
24 |
M2 |
$150.00 |
$3,600.00 |
|
$180.00 |
$4,320.00 |
35 |
BAR
REINFORCING STEEL |
1131 |
KG |
$1.50 |
$1,696.50 |
|
$1.83 |
$2,069.73 |
36 |
450 MM REINFORCED CONCRETE PIPE |
13 |
M |
$110.00 |
$1,430.00 |
|
$125.00 |
$1,625.00 |
37 |
600 MM REINFORCED CONCRETE PIPE |
44 |
M |
$150.00 |
$6,600.00 |
|
$180.00 |
$7,920.00 |
38 |
900 MM REINFORCED CONCRETE PIPE |
770 |
M |
$170.00 |
$130,900.00 |
|
$190.00 |
$146,300.00 |
39 |
900 MM PRECAST CONCRETE PIPE
MANHOLE |
2.3 |
M |
$400.00 |
$920.00 |
|
$500.00 |
$1,150.00 |
40 |
CONCRETE (CHANNEL LINING) |
110 |
M3 |
$245.00 |
$26,950.00 |
|
$380.00 |
$41,800.00 |
41 |
MISCELLANEOUS IRON AND STEEL |
3649 |
KG |
$3.20 |
$11,676.80 |
|
$3.80 |
$13,866.20 |
42 |
MISCELLANEOUS METAL (BRIDGE) |
770 |
KG |
$8.70 |
$6,699.00 |
|
$10.30 |
$7,931.00 |
43 |
METAL BEAM GUARD RAILING (WOOD
POST) |
12 |
M |
$183.00 |
$2,196.00 |
|
$197.00 |
$2,364.00 |
44 |
CONCRETE BARRIER (TYPE 736S) |
66 |
M |
$206.00 |
$13,596.00 |
|
$300.00 |
$19,800.00 |
45 |
CONCRETE BARRIER (TYPE 736SV) |
780 |
M |
$336.00 |
$262,080.00 |
|
$386.00 |
$301,080.00 |
46 |
CONCRETE BARRIER (TYPE 736SV
MODIFIED) |
36 |
M |
$356.00 |
$12,816.00 |
|
$387.00 |
$13,932.00 |
47 |
TERMINAL ANCHOR ASSEMBLY (TYPE
SFT) |
1 |
EA |
$800.00 |
$800.00 |
|
$900.00 |
$900.00 |
48 |
TERMINAL SYSTEM (TYPE SRT) |
1 |
EA |
$2,000.00 |
$2,000.00 |
|
$2,100.00 |
$2,100.00 |
49 |
LIGHTING AND SIGN ILLUMINATION |
1 |
LS |
$18,000.00 |
$18,000.00 |
|
$26,000.00 |
$26,000.00 |
50 |
IRRIGATION CONTROLLER
ENCLOSURE CABINET |
1 |
EA |
$2,800.00 |
$2,800.00 |
|
$3,800.00 |
$3,800.00 |
51 |
ELECTRIC SERVICE (IRRIGATION) |
1 |
LS |
$5,600.00 |
$5,600.00 |
|
$7,000.00 |
$7,000.00 |
52 |
MOBILIZATION
|
1 |
LS |
$187,000.00 |
$187,000.00 |
|
$229,000.00 |
$229,000.00 |
|
|
|
Aggressive Total |
$1,787,614.10 |
|
Cautious Total |
$2,193,230.43 |
|
|
|
Special Notes |
|
|
|
This is a Preliminary Estimate of the
bid. The unit prices represented are common to the location
and quantity of similar items from similar projects. The
unit prices do not reflect specific conditions for this
project. |
|
. |
|
|
The Preliminary Estimate is Not site specific
and does Not reflect special conditions for the project.
Bidders are advised to perform their own takeoffs and
cost estimates. |
|
|
|
|
No guarantee either expressed or implied
may be warranted for the accuracy or thouroughness of
the unit prices or totals. Any recipient of this work
is responsible for his own review and analysis of the
prices provided. In the event of a lawsuit, Contractors
Estimate may only be held liable for no more than the
amount for which the preliminary estimate was sold. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|